Similar Projects
Lehi City Monument Park Playground
New Construction
Bidding
Lehi, UT 84043

Lehi City Park Playgrounds
Post-Bid
Lehi, UT 84043

Spanish Fork City`s All Ability Park
Post-Bid
Spanish Fork, UT 84660

Lakeview Parkway-Phase I
Results
Provo, UT

Highland City Parks Maintenance Building
Results
$800,000 to $900,000 est. value
Highland, UT 84003

Orem YSA Pavilion
New Construction
Construction
Orem, UT 84957

Pony Express Parkway Median Improvements
Post-Bid
Eagle Mountain, UT 84005

Outside Tennis Court Improvements
Term Contract
Results
Spanish Fork, UT 84660

Clyde Grass Soccer Field
Post-Bid
Orem, UT 84058

Spring Creek Park Construction
Results
$400,000 to $500,000 est. value
Highland, UT 84003

Rotary Park Tennis and Pickleball Complex Design and Build
Post-Bid
Provo, UT 84606

Playground Equipment Installation-North Park Unlimited Play Center
Results
Provo, UT 84606

Centennial Park Basketball Court
Post-Bid
Santaquin, UT 84655

North Park Unlimited Play Center-Artificial Turf/Grass
Results
Provo, UT 84606

Peaks Ice Arena Indoor Turf Replacement
Post-Bid
Provo, UT 84606

Reported 07/31/2020 12:00 AM
Project Title

Orem Family Fitness Center Indoor Playground

Physical Address View project details and contacts
City, State (County) Orem, UT 84057   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/09/20
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will design, construct, and install a new indoor playground at the remodeled Orem Family Fitness Center (which is currently under construction), located at 580 W 165 S, Orem, UT. The existing flooring in the playground area is concrete, though the building’s flooring contractor is currently planning to install Mondo rubber flooring in the area prior to indoor playground equipment installation.. However, if the contractor would prefer a different type of flooring or needs any additional surfacing for the playground, the contractor is also responsible to specify these needs and include the cost (including installation) in their proposal. The playground should appeal to children of all ages (2 - 12), but should have a particular focus on children ages 7 and younger. The area available for the playground is an approximate rectangular shape, though the 2 “long” sides measure 4’ different in length. More specifically, the dimensions of the available space are the following (see Exhibit “A” for location inside facility; note that these dimensions account for the steps and clearance in the room): o Length 1 (shorter long side) - 64’ o Length 2 (longer long side) - 68’ o Width - 21’ 7” o Height: 15’

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents