Similar Projects
2019 Optimized Remediation Contract for Hill AFB, UT
Post-Bid
UT 84056

National Forest Timer for Sale Dixie National Forest
Post-Bid
Cedar City, UT 84721

Refuse-Recycle Collection Services Tooele Army Depot, Tooele, UT
Results
Erda, UT 840745000

S--Solid Waste and Recycling Collection and Disposal
Results
Salt Lake City, UT 841480001

National Forest Timer for Sale Dixie National Forest
Post-Bid
Cedar City, UT 84721

Snow Removal Services USDB Springville Campus
Results
Springville, UT 84663

Sump Testing and Waste Removal
Term Contract
Post-Bid
Herriman, Riverton, South Jordan, West Jordan, UT 84081

Region 2 Headquarters Snow Removal
Term Contract
Results
Salt Lake City, UT 84104

Lehi City Debris Removal Contractor Prequalification
Post-Bid
Lehi, UT 84043

Refuse Service for Unified Labs 1 and 2
Term Contract
Results
Less than $28,000 est. value
Taylorsville, UT 84119

UDOT Litter Collection
Term Contract
Post-Bid

BLM-UT Little Sahara & Yuba Reservoir Trash Collection and Disposal
Results
UT

Oil Water Separators, Sump, Trench, Pits, and Floor Drain Cleaning Including Disposal of Waste
Term Contract
Post-Bid

Waste and Recycling Collection Services
Term Contract
Results
Salt Lake City, UT 84114

Waste Disposal Management
Term Contract
Post-Bid
Highland, UT 84003

Reported 11/23/2019 12:00 AM
Project Title

Snow Removal

Physical Address View project details and contacts
City, State (County) Cedar, UT 84720   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate - 11/12/19
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consist of clearing snow from both the East Side and West Side parking lots, plus clearing the top level and entrances and exists to the East Side parking garage for the Cedar City Downtown Parking Authority. West parking lot boundaries are Center Street to Hoover Avenue between Main Street and 100 West. East parking lot boundaries are south of Lin’s parking lot to Center Street between Main Street and 100 East.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents