Similar Projects
Kirtland Central High School Fieldhouse HVAC and Roof Upgrade 2021
Renovation, Alteration - 8,170 SF
Bidding
$925,000 est. value
Kirtland, NM 87417

Removal and Replacement of HVAC Systems
Post-Bid
Albuquerque, NM

Replacement of Heating and Air Conditioning Units at the Sandstone Manor Apartments
Post-Bid
Roswell, NM 88203

Southern New Mexico Correctional Facility (SNMCF) Level 2 HVAC and Roof Replacement
Results
Las Cruces, NM 88004

Heat Treat Furnace
Results
NM

S201--501- Kitchen Hood Cleaning
Post-Bid
Albuquerque, NM 87108

Clovis Civic Center HVAC Replacement
Results
Clovis, NM

Maintenance Shop Exhaust System-City Vehicle Services
Post-Bid
Gallup, NM 87301

HVAC systems at Dexter Elementary School
Results
Dexter, NM 88230

41--Refrigeration Unit, 90 Ton Cooling Capacity
Post-Bid
Las Cruces, NM 88002

HVAC Renovation of Building 1622
Renovation
Results
$1,000,000 to $5,000,000 est. value
NM

Plumbing and HVAC Repair and Installation
Post-Bid
Estancia, NM 87016

Welding Program Air Compressors and Receiver Tank
Results
Farmington, NM

Annual Chiller Maintenance Services
Term Contract
Post-Bid
$50,001 to $100,000 est. value
Farmington, NM 87402

Rio Rancho Elementary School Cafeteria HVAC Upgrades
Results
Rio Rancho, NM 87124

Last Updated 06/25/2021 12:44 PM
Project Title

HVAC Replacement at Martin Luther King Elementary School

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM 87124   (Sandoval County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation and replacement of HVAC systems, including the existing boiler system. Patching of the existing TPO roofing as required at replaced equipment. Replacement of ceilings, light fixtures, and wall base in hallways and corridors. Replacement of existing light fixtures with new dimmer switches in hallways, classrooms, and various rooms. Selective removal and replacement of existing tile from classrooms. Removal and replacement of existing VCT in hallways and corridors with new resilient flooring.

Details

Division 09 - Finishes, Ceilings, Flooring.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 26 - Electrical, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents