Similar Projects
Millspring Village Subdivision
New Construction, Infrastructure
Conception
$44,000,000 CJ est. value
Greenville, SC 29617

Zoo Walkway Repaving - City of Greenville
Infrastructure
Conception
$366,500 CJ est. value
Greenville, SC 29601

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

Repave Basketball Court, Needmore Center
Infrastructure
Design
$32,000 CJ est. value
Greer, SC 29650

Resurfacing and Upgrades to Fairview Street Park Basketball Court
Infrastructure
Bidding
$200,000 CJ est. value
Fountain Inn, SC 29644

Safety Improvements - Sc 146 (Greenville Co)
Infrastructure
Bidding
$1,600,000 CJ est. value
Simpsonville, SC 29681

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

SGFD Training Tower Foundation
Infrastructure
Post-Bid
Pelzer, SC 29669

Site Grading at 113 Leesburg Peak
Results
Greer, SC 29651

New Simpsonville Municipal Complex Construction Management at Risk CMAR Firm
New Construction
Results
$13,500,000 est. value
Simpsonville, SC

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Millennium Ambulatory Surgery Center
New Construction, Infrastructure - 34,700 SF
Pending Verification
$38,000,000 CJ est. value
Greenville, SC 29607

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

Culvert Installation and Road Paving at Century Park
Infrastructure
Design
$265,000 CJ est. value
Greer, SC 29650

Last Updated 10/06/2022 03:32 PM
Project Title

RFP Construction Manager at Risk - Construction Manager at Risk Summary Court

Physical Address View project details and contacts
City, State (County) Simpsonville, SC 29681   (Greenville County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction start expected April 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $119,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**Project is currently on hold.** The County of Greenville is requesting sealed proposals for Construction Manager at Risk for a Summary Court to be constructed in Simpsonville, South Carolina.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents