Similar Projects
Redlands Christian Migrant Charter School
New Construction
Conception
Mulberry, FL 33860

New K-5
Conception
FL

Faith and Life Fellowship Ministries and Alpha International Academy Charter School
New Construction, Renovation, Demolition - 19,443 SF
Design
$3,000,000 est. value
Hollywood, FL 33020

K-12 International Boarding School
New Construction
Design
Panama City, FL 32409

New Marianna K-8 School
New Construction - 335,000 SF
Post-Bid
Less than $50,000,000 est. value
Marianna, FL

Construction Manager at Risk Services for Robert C Markham Elementary School
Post-Bid
Less than $8,552,850 est. value
Pompano Beach, FL

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

Smart Program Renovations Panther Run Elementary School
Results
Less than $947,715 est. value
Pembroke Pines, FL 33029

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Palmer Trinity School - Classroom Building
New Construction - 2,100 SF
Construction
$500,000 to $1,000,000 CJ est. value
Palmetto Bay, FL

Academica K - 12 Charter School
New Construction
Conception
Royal Palm Beach, FL 33411

Carrollton Boys School
New Construction - 66,602 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Miami, FL

Joella C. Good Elementary School Renovations
Renovation - 93,863 SF
Post-Bid
Less than $3,136,235 est. value
Hialeah, FL 33015

Brentwood Elementary School Covered Play Area And Multipurpose Room
Results
Pensacola, FL 32505

Witt Elementary School Renovation and Addition
Renovation, Addition
Construction
$17,000,000 est. value
Bradenton, FL 34212

Reported 06/18/2020 04:19 AM
Project Title

Oscar J Pope Elementary - Repair Storm Damage

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33801   (Polk County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, Concrete, Masonry, Structural Steel, Millwork, Carpentry/Framing, Roofing, Doors/Frames/Hardware, Framing/Drywall, Acoustical Ceilings, Painting, Floor Covering, Signage, Specialties, HVAC, Plumbing, and Electrical/Low Voltage/Fire Alarm.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents