Similar Projects
Wastewater Lagoon, Carrol Creek Lift Station and Gravity Sewer Improvements
Infrastructure
Design
$850,000 CJ est. value
Liberty, MS 39645

Lift Station Rehabilitation
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Byhalia, MS 38611

Port of Pascagoula Bayou Casotte Facility Sewer Pump Station and Force Main Project
Renovation, Infrastructure
Bidding
$950,000 CJ est. value
Pascagoula, MS 39567

Lift Stations Modifications
Renovation
Post-Bid
MS

Turner Park Lift Station
New Construction
Post-Bid
Saltillo, MS

Pump Station No. 8 Rehabilitation Project
Renovation
Results
Pascagoula, MS

Industrial Sewer Improvement
New Construction
Results
$350,000 to $400,000 est. value
MS

2021 Wastewater Improvements
Renovation, Infrastructure
Construction
$338,600 CJ est. value
Hickory, MS 39332

Raytheon Water Well
Infrastructure
Bidding
$300,000 CJ est. value
Forest, MS 39074

Yazoo Backwater Pumping Plant
New Construction
Post-Bid
$250,000,000 to $500,000,000 est. value
Vicksburg, MS

Comprehensive Sanitary Sewer Improvements Project - Contract No 3A - Pump Station Improvements Phase One
Renovation, Infrastructure
Results
Greenville, MS

Sewer System Pumps/Lift Stations (7) Replacement
Renovation
Post-Bid
Marks, MS

Sewer System Improvements Contract C - Carter Avenue Lift Station Improvements
Renovation
Results
New Albany, MS 38652

Trautman Basin Wastewater Improvements
New Construction, Infrastructure
Post-Bid
Long Beach, MS 39560

2020 Sewer Rehabilitation
Renovation, Infrastructure
Results
$334,350 est. value
Stonewall, MS

Last Updated 08/22/2022 11:32 PM
Project Title

Wastewater Improvements

Physical Address View project details and contacts
City, State (County) De Kalb, MS 39328   (Kemper County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $324,116 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Principal items of work at Existing Sewer Lagoon No. 1 includes construction of new chlorine contact chamber, bio-reactor and demolition of existing chlorine contact chamber. Principal items of work near Kemper County High School include construction of new sewer pump station, installation of approximately 410 linear feet of 2 force main, connecting to existing manhole and abandonment of existing aerial creek crossing. The award, if made, will be made to the lowest qualified bidder on the basis of unit prices and quantities in the contract documents. Actual work quantities performed shall be based on availability of local funds. The work to be done is generally as shown on the plans. The Mayor and Board of Aiderman hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement all minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. This project is funded by the HUD Community Development Block Grant Program and is a Section 3 covered activity as defined by the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u) (Section 3). Contractors and subcontractors are encouraged to provide to the greatest extent feasible, training, employment and contracting opportunities generated by the expenditure of this assistance to low-and very-low income persons and business concerns owned by low-and very-low income persons or which employ low-and very-low income persons. Certified check or bid bond for five (5%) percent of the total bid, made payable to the Town of DeKalb must accompany each proposal as required by State Law. Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award. The Town of Dekalb reserves the right to accept or reject any and/or all bids to waive informalities.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents