Similar Projects
Bluff Park Elementary School Fluid Cooler Replacement
Alteration
Bidding
Hoover, AL 35226

Central Utilities Chilled Water System Upgrades
Alteration
Bidding
$900,000 to $1,200,000 est. value
Birmingham, AL 35233

Inspect and Perform Weatherization on Houses for our Weatherization Assistance Program in the Jefferson Count Area
Post-Bid
Birmingham, AL 35204

Air Filters
Post-Bid
Birmingham, AL

Mountain Brook High School Social Science Building RTU Replacements
Results
Less than $320,000 est. value
Mountain Brook, AL

Miles College Kirkendoll LRC HVAC Upgrade
Results
Fairfield, AL 35064

Highlands 6th and 7th Floor Air Handler Replacement
Alteration
Bidding
Birmingham, AL 35205

JEFCO 2021 Chiller Replacements for Clay Chalkville High School Oak Grove High School and Oak Grove Elementary School
Post-Bid
Bessemer, Pinson, AL 35126

HVAC Upgrades for Media Center and Nurses Station, Westhills Elementary School
Results
Less than $100,000 est. value
Bessemer, AL 35022

Shades Cahaba Elementary School HVAC Replacements
Post-Bid
$176,500 est. value
Homewood, AL 35209

UAB Quarterback Tower AHU-2 Replacement
Results
$1,874,600 est. value
Birmingham, AL

Cudworth Building Connection to Chilled Water - Phase 3
Post-Bid
$85,000 to $115,000 est. value
Birmingham, AL 35233

Electrical, Plumbing, and Compressed Air Services
Results
Birmingham, AL

Home Weatherization Services
Post-Bid
AL

ALEA HVAC Maintenance and Repair
Results
Alexander City, Birmingham, AL 35204

Last Updated 12/02/2021 10:25 AM
Project Title

Spain Wallace Second Floor Molecular Lab Fan Coil Unit Replacement

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work entails the replacement of two above ceiling fan coil units and associated construction in the Spain Wallace 2nd Floor laboratory. The scope includes removal of existing and installation of new units, piping and insulation, and controls. The work shall be performed within the operating hospital facility using a high level of infection control measures. The Contractor shall demonstrate experience with the implementation and maintenance of infection control measures and interim life safety measures in hospital environments. The Contractor shall also demonstrate experience with performing construction in a hospital environment which had to remain operational during construction.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents