Similar Projects
Candlewood Pines
Infrastructure
Conception
Danbury, CT

Nautilus Pier Water Taxi Dock
Post-Bid
Groton, CT 06340

Westbrook Town Beach Reconstruction of Timber Groins 1 and 3
Infrastructure
Post-Bid
Westbrook, CT 06498

Thames River Marina Dock Removal Project
Results
Waterford, CT 06385

Construction Manager at-Risk (CMR) for Infrastructure Improvements to Connecticut State Pier
Results
New London, CT 06475

Ferry Slip
Construction
New London, CT

Harbor Management Ferry Road Floating Docks and Ramps
Infrastructure
Post-Bid
Old Saybrook, CT

Expansion of Concrete Loading Dock at Turkey Hill School
Results
Orange, CT 06477

Supply of Floating Docks and Ramps - Ferry Road Town Dock
Infrastructure
Post-Bid
Old Saybrook, CT

Branford Point Seawall and Wharf Repair
Results
Branford, CT

Harbor Management Ferry Road Added Floating Docks and Ramps
Infrastructure
Post-Bid
Old Saybrook, CT 06475

Design, Fabrication and Installation Services for Baldwin Bridge State Boat Launch Floating Dock Systems
Results
Old Saybrook, CT 06475

Boat Launch Dock
Infrastructure
Post-Bid
$40,000 est. value
Danbury, CT

New Business Venture - Waterfront Promenade
Results
New London, CT

Coventry Lake Sbl Floating Docks
Infrastructure
Post-Bid
$38,000 est. value
Portland, CT

Last Updated 06/20/2022 08:39 AM
Project Title

Design-Bid-Build, P1097 Relocate Underwater Electromagnetic Measurement System

Physical Address View project details and contacts
City, State (County) New London, CT   (New London County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Design-Build.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of work: Project constructs a steel fabricated three-level platform, approximately 20' x 20', supported by four steel piles in the Thames River at Groton, Connecticut, including a weather and corrosion resistant Data Concentrator Shed (DCS) on the third deck which will support and house equipment for an Underwater Electromagnetic Measurement System (UEMMS), and the construction and connection of two composite submarine cables supporting power and communications from the Range House on the New London side of the river. Both composite cables will be installed together by jet-plow method four-feet into the river bottom and protected by concrete matting. Design and construction of the UEMMS equipment will be by others. Option includes the complete demolition, including pile extraction, of the existing platform, DCS and UEMMS, in an out-year requiring remobilization.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents