Similar Projects
Deck Replacement, Full Painting, Substructure Repair, Riprap Placement, Approach Work and Maintaining Traffic on M-66
Infrastructure
Bidding
$792,000 CJ est. value
Nashville, MI 49073

School District Monument Sign Upgrade
Renovation, Infrastructure
Bidding
$20,000 CJ est. value
Middleville, MI 49333

2022 Riverside Park Improvements
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Nashville, MI 49073

2023 Proposed Parking Lot 8 Reconstruction
Infrastructure
Post-Bid
$251,771 CJ est. value
Hastings, MI 49058

Thornapple Kellogg Schools High School Renovations
Renovation, Infrastructure
Results
$4,781,850 CJ est. value
Middleville, MI 49333

Delton Kellogg Schools Elementary Addition & Remodeling
Renovation
Results
$167,179 CJ est. value
Delton, MI 49046

2022 Whippoorwill/Greenwood Street Sanitary Sewer and Water Main Improvements and Village-Wide Sanitary Sewer CIPP Project
Infrastructure
Construction
$787,414 CJ est. value
Middleville, MI 49333

150,000 Gallon Elevated Tank
Infrastructure
Construction
$2,003,140 CJ est. value
Barry Township, MI 49046

TK Middle School Serving Line Renovation
Infrastructure
Post-Bid
Middleville, MI 49333

2023 Shared Use Pathway Extensions
Infrastructure
Results
$1,920,135 CJ est. value
Thornapple Township, MI 49333

Cold Storage Facility
New Construction, Infrastructure - 320 SF
Post-Bid
$233,000 CJ est. value
Middleville, MI 49333

2024 Site Improvements
Infrastructure
Results
$1,846,867 CJ est. value
Middleville, MI 49333

Hastings Area Schools - Pool Dehumidifcation Unit
Renovation, Infrastructure
Post-Bid
$530,000 CJ est. value
Hastings, MI 49058

Barry State Game Area Headquarters New Pole Barn
Demolition, New Construction, Infrastructure - 2,400 SF
Results
$306,622 CJ est. value
Middleville, MI 49333

2023 Third Street Reconstruction Project and Tk Access Road Project
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Middleville, MI 49333

Last Updated 02/20/2024 08:50 AM
Project Title

Hastings Area School System 2023 Bond Projects - Bid Package #1 - Playground Equipment

Physical Address View project details and contacts
City, State (County) Hastings, MI 49058   (Barry County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Direct all inquiries to the construction manager. The project is NON-PREVAILING WAGE Addendum #1-#2 have been issued as of 1-5-2024.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents