Similar Projects
Main Water Loop
Infrastructure
Design
$2,000,000 to $5,000,000 est. value
Asheville, NC 28805

Main Water Loop
Infrastructure
Design
$2,000,000 to $5,000,000 est. value
Asheville, NC 28805

2020 Water Improvements - Contact No 2
Infrastructure
Bidding
Whitakers, NC

Queens Road West Water Main Replacement
Infrastructure
Bidding
Charlotte, NC

46--Water Fountain With Alkaline Water Filter System and Installation
Post-Bid
Fort Bragg, NC 28310

USDA Water and Sewer Improvements Contract 1 - Water Main Improvements Contract 2 - Sanitary Sewer Improvements
Post-Bid
West End, NC 27376

2017 Water and Sewer System Improvements
Results
Pine Level, NC 27568

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

Liberty Road Water and Sewer Improvements Phase III
Infrastructure
Bidding
Greensboro, NC 27497

USDA Water and Sewer Improvements Contract 3 - Elevated Storage Tank
Post-Bid
West End, NC 27376

2020 Water System Improvements Lakeshore Drive
Results
$350,000 to $450,000 est. value
Dunn, NC 28334

Town of Seaboard Contract No. 2 - Small Diameter Water Line Replacement
Infrastructure
Bidding
Seaboard, NC 27876

USDA Water and Sewer Improvements Contract 4 - Water Meter Replacement
Post-Bid
West End, NC 27376

J--Water System Deficiencies
Results
$50,000 to $100,000 est. value
Frisco, NC

3/4" Copper Pipe
Infrastructure
Bidding
Greensboro, NC

Reported 03/11/2022 11:05 AM
Project Title

Bodenheimer Steam Manhole Repair

Physical Address View project details and contacts
City, State (County) Boone, NC   (Watauga County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope consists of selective demolition, excavation, below-grade cast-in-place concrete construction, backfill & compaction, and repaving associated with the replacement of a steam manhole and the temporary shoring of two steam manholes as specified in the contract documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents