Similar Projects
Enhancement - S-3054 Richland Co
Infrastructure
Bidding
SC

Longreen Parkway Sidewalk Project
Infrastructure
Bidding
Columbia, SC 29229

Wildewood Subdivision Paving
Post-Bid
SC

Rehabilitation - Richland County
Post-Bid
SC

Statewide Paving - Improvements to Bert Friday Entrance
Results
$20,000 to $45,000 est. value
Columbia, SC 29210

Intersection Improvements - SC 12 and I-77
Results
SC

Raised Pavement Markers - District 1
Post-Bid

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Results
SC

Parking Lot Restoration Services
Post-Bid
Columbia, SC

Intersection Improvements - SC 555/S1274
Results
SC

County Line Trail Roadway Improvements
Post-Bid
$500,000 to $749,999 est. value
Columbia, SC

Preservation - District 1
Results

Mcentire Jngb Rnwy 14-32 Pavement Repair
Infrastructure
Post-Bid
Eastover, SC 29044

Enhancement - S-3054 Richland Co
Results
SC

Midlands - Parking Lot Repairs - Beltline Campus
Infrastructure
Post-Bid
$150,000 to $180,000 est. value
Columbia, SC 29205

Last Updated 12/22/2021 07:41 AM
Project Title

Dirt Road Package M

Physical Address View project details and contacts
City, State (County) Columbia, SC 29210   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of site work and traffic control including, but not limited to, clearing and grubbing, demolition, unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland County: Bow String Road, Maggie Hipp Road, Rosa Dowdy Road and Tall Oaks Drive.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents