Similar Projects
Fort Worth Building #2
New Construction
Conception
$66,000,000 est. value
Crowley, TX 76036

Texas A&M Law School Building
New Construction
Conception
Fort Worth, TX 76102

Fort Worth Building 2
New Construction
Post-Bid
Fort Worth, TX

South Campus SLIB 1115 B-X IDF Expansion
Post-Bid
Fort Worth, TX 76119

OC OWTL Welding Lab Renovations
Renovation
Results
Fort Worth, TX 76177

OC OWTL Corporate Services 3rd Floor Renovation
Renovation
Results
Fort Worth, TX 76177

Green Oaks School Dormitory
New Construction
Construction
$1,000,000 to $5,000,000 CJ est. value
Arlington, TX 76011

Academic Building for School of Social Work and College of Nursing
Construction
$63,700,000 est. value
Arlington, TX 76019

Baylor Scott and White Education Center
Build-Out - 907 SF
Pending Verification
Fort Worth, TX 76104

NHPE Shower Renovation
Renovation
Post-Bid
Fort Worth, TX

UNT HSC Bioskills Lab Renovation
Renovation
Results
Fort Worth, TX 76107

Deloitte University
Renovation
Construction
$2,000,000 est. value
Westlake, TX 76262

Texas Wesleyan GPNA Building
Renovation - 12,000 SF
Post-Bid
Fort Worth, TX 76105

Job Order Contracting Services
Renovation
Results
Arlington, TX 76019

SE Campus New Building Additions and Renovations
Renovation, Addition
Post-Bid
Arlington, TX 76018

Reported 04/29/2022 09:06 AM
Project Title

New Maverick Residence Hall Design-Build

Physical Address View project details and contacts
City, State (County) Arlington, TX 76019   (Tarrant County)
Category(s) Education, Residential
Sub-Category(s) College/University, Dormitory
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Maverick Hall will be about 150,000 square feet and house a mixture of single and double occupancy rooms, grouped as suites. The building is intended to be five to six stories. Common area amenities shall include a classroom, study rooms, laundry facilities, large and small gathering spaces, and community kitchens. Additionally, exterior green space that serves both Maverick Hall and the existing West Hall will be included.

Details

150,000 SF - College/University, New Construction, Dormitory, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents