Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

Replace Building 48 Roof System
Term Contract
Design
$500,000 to $1,000,000 est. value
Hines, IL 60141

Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

2021 Roof Repairs at MAC Arthur Middle School
Post-Bid
Prospect Heights, IL 60070

Grove Elementary School Campus
Renovation, Addition
Post-Bid
Barrington, IL 60010

2021 School Renovations and Additions
Renovation, Addition
Results
Mount Prospect, IL 60056

Roof Replacement Work 2021
Renovation
Results
Less than $400,000 est. value
Chicago, IL 60638

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Heatherfield Roof Replacements
Renovation, Alteration
Design
Glenview, IL 60025

2021 Pietrini, North & Passow ES Library
Renovation
Post-Bid
Franklin Park, IL 60131

2021 Roofing Work at Various Schools
Results
Buffalo Grove, Elk Grove Village, Rolling Meadows, IL 60089

Replace Shingled Roofing Systems
Post-Bid
$3,500,000 est. value
Chicago, IL

2021 Roof Replacement
Results
Wheeling, IL 60090

STEAM Lab at Karel Havlicek ES
Renovation
Post-Bid
Berwyn, IL 60402

Last Updated 07/24/2022 11:01 PM
Project Title

Mount Vernon Complete roof tear off and replacement

Physical Address View project details and contacts
City, State (County) Chicago, IL 60643   (Cook County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mount Vernon Complete roof tear off and replacement Roofing Field Area: 1. Field-applied reflective coating (as specified), over; 2. One layer of granulated modified bitumen cap sheet in hot asphalt OR in cold adhesive, in lieu of hot asphalt, (at roofing manufacturer's option and per roofing manufacturer's recommendation - FOR CAP SHEET ONLY), over; 3. One layer of reinforced base ply sheet in hot asphalt adhesive, over; 4. One layer of Type VI glass-fiber ply sheet in hot asphalt, over; 5. Gypsum fiber or coated wood fiber cover board in hot asphalt adhesive, over; 6. Flat and/or tapered polyisocyanurate insulation (as specified), in hot asphalt adhesive, over; 7. The underlying deck assemblies with associated preparations (including vapor barriers/temporary roofs), as specified in Sections 3.06 thru 3.08 of this Specification. 8. Base Flashing Areas: 1. Field-applied reflective coating (as specified), over; 2. One layer of granulated modified bitumen cap sheet in hot asphalt OR in cold adhesive, in lieu of hot asphalt, (at roofing manufacturer's option and per roofing manufacturer's recommendation - FOR FLASHING CAP SHEET ONLY), over; 3. One layer of Type VI glass-fiber ply sheet (backer sheet) in hot asphalt.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents