Similar Projects
Fire Station 14 Workforce Privacy Project
Infrastructure, Renovation - 8,820 SF
Bidding
$53,425 CJ est. value
Long Beach, CA 90803

Michelson Water Recycling Plant Tertiary Filter Improvements
Renovation, Infrastructure
Bidding
$17,899,000 CJ est. value
Irvine, CA 92612

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

On-Site Non-Potable Water Reuse Strategy
Alteration
Post-Bid
$250,000 est. value
Sacramento, CA

As Needed Plumbing Maintenance and Repair for Met In-Town Housing (Multiple Locations)
Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

Glen Avon Elementary School Sitework
Renovation, Infrastructure, Alteration
Results
$1,300,000 est. value
Riverside, CA 92509

2023 Patch Paving
Infrastructure
Bidding
$360,000 CJ est. value
Tahoe City, CA 96145

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

As Needed Plumbing Services
Term Contract
Results
Oakland, CA

Cleaning of Digester #1 and Cleaning/Rehabilitation of Digester #12 at the Fresno/Clovis Regional Wastewater Reclamation Facility
Renovation, Infrastructure
Bidding
$1,300,000 CJ est. value
Fresno, CA 93721

As Needed Plumbing Maintenance and Repair for Metropolitan`s Hinds Pumping Pump Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

SDIA - Airport Administration Building - Plumbing
Alteration
Results
San Diego, CA 92108

As Needed Plumbing Maintenance and Repair for Metropolitan's Iron Mountain Pumping Pump Plant Housing
Term Contract
Post-Bid
$240,000 est. value
Los Angeles, CA

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Last Updated 05/04/2023 01:01 AM
Project Title

RFP - Water Year 2023-2025 Ecological and Operational Streamflow Monitoring

Physical Address View project details and contacts
City, State (County) Boulder Creek, CA 95006   (Santa Cruz County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The District seeks to continue flow and temperature monitoring during the "dry season" at Foreman Creek and Boulder Creek. This data will be used in an ongoing conjunctive use study, to support regulatory processes, District operations, and permitting. Dry season monitoring has been taking place at Foreman Creek and Boulder Creek (with a gap in 2021) since 2013 to understand the effects of the diversion on downstream habitat and the watershed as a whole. Monthly monitoring site visits will take place June through November to establish baseline data and make observations during the dry season. Currently, a staff plate and two Solinst Leveloggers are being used to collect continuous depth and temperature data. Consultant staff are encouraged to make regular site Page 3 of 6 visits to note changes in field conditions, collect data, and make repairs as needed. As diversions are brought back online additional dry season monitoring sites will be added. Task 2: Operational gaging at Fall Creek There is currently a real-time station installed at the Fall Creek Fish Ladder. This station reports data back to an online portal managed by the current consultant, which is used to actively manage the diversion. The District would like to continue real-time (reports every 15 minutes) monitoring with site visits made monthly throughout the year to ensure accuracy of gage. The gage will potentially need to be relocated downstream after upgrades to the fish ladder are completed in October 2023. No written report or flow record will be needed but data should be assessable in real-time via an online portal or through the District's Supervisory control and data acquisition (SCADA).

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents