Similar Projects
Construction Services for the EIBJCWTP Fall Protection Improvements
Alteration
Results
American Canyon, Napa, CA 94503

Construction Services (Replace Concrete Landing, Stairs and Guard Rails), at Arrowhead Area Office)
Term Contract, Alteration
Bidding
Running Springs, CA 92382

CCC Camarillo Center Gutter and Downspouts Replacement
Alteration
Results
$200,000 est. value
Camarillo, CA

On-Call Handyperson Services
Alteration
Bidding
Livermore, CA

Front Entrance Soffit Replacement
Term Contract
Post-Bid
Richmond, CA 94801

New Lunch Shelter Project at Heritage Elementary School
Alteration
Bidding
Lodi, Stockton, CA 95240

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Bidding
$750,000 to $950,000 est. value
Palm Springs, CA 92264

CCC Tahoe Center Gutter and Downspouts Installation
Alteration
Bidding
$25,000 est. value
South Lake Tahoe, CA 96150

Reported 10/21/2021 12:00 AM
Project Title

Fairbarin Water Treatment Plant Lab Building Exterior Improvements

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95826   (Sacramento County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior improvements to building and roof facade, including removal and replacement of roof drains & scuppers, cleaning out of drain leaders, investigating leaders for damage related to corrosion. Removal and replacement of coping cap, providing concealed cleat, providing sufficient overlap at splice joints, and positive drainage. Improve slope using tapered rigid insulation and replace canopy roofs with single-ply system. Fill all horizontal reveals per drawings, seal watertight, investigate for water damage, corrosion or mold and repair. Add metal panel system with drainage plane against existing cement plaster. Add metal panel system with drainage plan against repaired exterior wall sections. Remove and repair damaged cement plaster and sheathing. Clean existing cement plaster system in according to air/water barrier manufacturer requirements. Repair existing sealant joints with compatible materials at locations where new weather barrier membranes or new flashing penetrate joints. Provide weeps as appropriate, and waterproof exterior finish system. Provide metal closures at existing window and door recessed openings. Extend out the existing wall-mounted fixtures, signs, cameras, hose bibs, electrical outlets, etc. Contractor to notify roofing manufacturer of work to be performed to maintain existing warranty.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents