Similar Projects
Miami Pump Station Elimination with Low Pressure System and Force Main Installations
Addition
Bidding
Less than $1,000,000 est. value
Egg Harbor Township, NJ

Jersey Avenue Pump Station Replacement
Alteration
Bidding
Metuchen, NJ 08840

Rehabilitation Of Roosevelt Avenue Pump Station
Post-Bid
Carteret, NJ 07008

Diamond Drive Pump Station Rehabilitation
Post-Bid
Waretown, NJ 08758

Pump Station 5 Upgrade
Results
Old Tappan, NJ 07675

Clay Street Pump Station Rehabilitation
Results
Riverside, NJ 08075

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Bidding
Long Branch, NJ 07740

2020 Proposal Influent Grinders for Wastewater Stations
Term Contract
Post-Bid
Somers Point, NJ 08244

Communitor Sewage Grinder for Pump Stations
Results
Forked River, NJ 08731

Shrewsbury Avenue Pump Station Upgrades
Infrastructure
Bidding
Tinton Falls, NJ 07724

2020 Proposal Sewer Pump Station Maintenance
Term Contract
Post-Bid
Somers Point, NJ 08244

Rutgers Drive and Nutmeg Court Pump Station Upgrades
Results
$415,000 est. value
Tinton Falls, NJ 07724

Comminutor Installation at Various Pump Stations
Infrastructure
Bidding
Vineland, NJ

Grandview Pump Station Improvements
Post-Bid
Thorofare, NJ 08086

Maintenance and Service of Atlantis Avenue Flood Gate and Fisherman's Park Pump Station
Results
Atlantic City, NJ 08401

Reported 07/09/2021 12:00 AM
Project Title

Wallington Pumping Station Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Wallington, NJ   (Bergen County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under Contract No. B103 includes furnishing all labor, materials, supplies, equipment and other facilities required by the Contract Documents for the modernization and rehabilitation of the PVSC Wallington Pumping Station. Work includes, but not limited to the replacement of the aging vertical long-shaft driven suction lift pumps with new suction lift pumps having long-coupled 150 HP motors; replacement of the load resister banks with VFDs; replacing the electrical equipment; installation of new control panels and instruments for the building and pumping station; constructing a rock/gravel trap for their removal on the 54" influent sewer; installing comminutors, and reconditioning the existing wet-well. Additional work includes bringing the building into compliance with current codes; reconfiguration of the interior spaces of the building by replacing and relocating the existing generator and electrical equipment, demolishing unused interior spaces to allow for the construction of a break room, new restrooms and locker room with shower; construction of a new SCADA control, reconstructing the main entrance stairs, construction of an access ramp, replacing the exterior windows and doors, replacing the interior doors, re-roofing the building, repairing the building parapets, repointing the brick, and waterproofing the building.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents