Similar Projects
Philmnt/Tomlinson/Pine Rd Int
Infrastructure
Conception
$24,196,000 CJ est. value
Lower Moreland Township, PA 19006

District Wide Bridge Rehab Group P
Infrastructure, Renovation
Conception
$8,358,000 CJ est. value
Schwenksville, PA 19473

AutoZone #5334 / Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

N Narberth Avenue O/AMTRAK
Demolition, New Construction, Infrastructure
Design
$10,747,000 CJ est. value
Narberth, PA 19072

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Taylor Farm Demolition Project
Demolition, Infrastructure
Results
Royersford, PA 19468

Remington Basin Improvements and Penn Wynne Park Bio-Swale
Infrastructure
Results
Wynnewood, PA 19096

Ursinus College Main Street Pedestrian Improvements
New Construction
Construction
$930,000 est. value
Collegeville, PA 19426

Coulter Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 147,462 SF
Construction
$100,000,000 CJ est. value
Ardmore, PA 19003

Mancill Mill Road Apartments
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
King of Prussia, PA 19406

Bala and Highland Avenue Multi Residential
New Construction, Infrastructure - 2,650 SF
Pending Verification
$7,500,000 CJ est. value
Bala Cynwyd, PA 19004

Main Street/SR 29 Ped Improvements
Infrastructure
Conception
$682,000 CJ est. value
Collegeville, PA 19426

23: Moore to Geerdes
Infrastructure
Design
$23,610,000 CJ est. value
King of Prussia, PA 19406

Royal Farms #407 / Lower Pottsgrove Township
New Construction, Infrastructure - 6,628 SF
Post-Bid
$2,000,000 CJ est. value
Pottstown, PA 19464

Last Updated 05/05/2023 09:05 AM
Project Title

Virginia Drive & Camp Hill Road Signalization

Physical Address View project details and contacts
City, State (County) Fort Washington, PA 19034   (Montgomery County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $305,658 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include installation of traffic signal equipment in three stages. Stage 1 will install underground conduit/junction boxes/controller pad and order mast arms before a General Contractor is selected for curb/widening work. Stage 2 will coordinate with a General Contractor to be selected with an independent contract for installation of mast arm/pedestal/pedestrian stub pole foundations. Stage 3 will install mast arms/controller/signal equipment after the General Contractor has completed curb/widening work. Clarification Deadline: 9/12/2022 4:00 PM

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents