Similar Projects
Building 587 Boiler Replacement
Term Contract
Bidding
$965,856 est. value
Salt Lake City, UT 84132

The Road Home - Palmer Court Air Handlers and Boiler Re-Solicitation
Alteration
Bidding
Salt Lake City, UT 84111

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

On-Call Task Order General Mechanical Construction Services
Term Contract
Post-Bid
Salt Lake City, UT 84114

H344--660 (Con) Engineering- Boiler 3Rd Party Inspection, Start-Up And Testing Services For 660-17-100 New Boiler Installation At The George E Wahlen Va Health Care System In Salt Lake City, Ut
Results
Salt Lake City, UT 84148

Canyon View Jr. Boiler Replacement
Results
Orem, UT 84097

2020 Dive and Splash Pools Boiler Replacement
Post-Bid
Kearns, UT 84118

Dfcm Construction-Pre Qualified Mechanical-Snow College Noyes Bldg. Chiller Replacement-21016700
Results
Less than $367,000 est. value
Ephraim, UT

2020 Replaster of the Outside Dive and Splash Pools
Post-Bid
Kearns, UT 84118

Removal of Existing Swimming Pool Boilers and Installation of New Boilers
Results
Less than $100,000 est. value
Lindon, UT 84042

Natural Gas Boilers
Post-Bid
Spanish Fork, UT

DFCM Construction-Pre Qualified Mechanical-W Jordan Courts Mechanical System and BAS-18251150
Results
Less than $3,000,000 est. value
West Jordan, UT 84088

South Davis Recreation District Roof and Mechanical Replacement
Post-Bid
Bountiful, UT 84010

Holladay Library Boiler Replacement
Results
Holladay, UT 84117

Sky View High School Pool AHU and Mountain Crest High School Boiler Replacement Project
Post-Bid
Hyrum, Smithfield, UT 84335

Reported 02/09/2022 12:00 AM
Project Title

Windsor Elementary School - Mechanical Upgrade

Physical Address View project details and contacts
City, State (County) Orem, UT 84057   (Utah County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this section includes the furnishing of all labor, materials, equipment, controls and accessories required to complete all heating, air conditioning, ventilating, drainage, and other mechanical systems as shown on plans and/or described in these specifications, including miscellaneous items required to provide a complete and functional facility. Work shall include, but shall not be necessarily limited to, the following: Testing, Balancing, Insulation systems, Air distribution systems, Air conditioning systems, Building automation systems, Special systems. The mechanical contractor shall provide all miscellaneous electrical work and control wiring for special systems where the wiring requirements are provided by the equipment manufacturers and/or suppliers, unless all of the required wiring is clearly shown on the electrical drawings to be provided by the electrical contractor.

Details

Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents