Similar Projects
Last Updated | 01/19/2023 05:10 AM |
Project Title | Sheridan College - Golden Dome IT/AV |
Physical Address | View project details and contacts |
City, State (County) | Sheridan, WY 82801 (Sheridan County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding Closed, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: 1 Whitney Way Sheridan WY 82801 Sheridan College Golden Dome IT/AV System General: Provide Audio-Video Systems design, engineering, and installation within all phases and spaces of the project and shall include all devices, equipment, installation, programming and commissioning in accordance with requirements of the contract documents and drawings. 1. The Work detailed within the Contract Documents has been specified to meet certain requirements for performance, appearance, and costs. It shall be the responsibility of the Contractor to implement the guidelines and requirements contained in the Contract Documents and translate them into a complete design package containing all elements necessary for a complete, operational, and functionally integrated Audio-Video System(s). 2. Provide all work as detailed in the Contract Documents as a turnkey installation including all material, labor, engineering, warranties, taxes, freight, and permits. Only items and requirements specifically stated to be provided by others shall not be a requirement for this Section of the Work. bid alt 1: provide bid add alternate for access control and video surveillance, include all priciing for access control and video surveillance cameras and controls. bid alt 2: provide bid add alternate for gym pod lighting as shown in drawings. include all pricing for lighting demolition, lighting installation, lighting controls and power. bid alt 3: provide bid add alternative for video wall. include all pricing for video wall equipment, cables, electronics and support structure Date of Commencement: January 30, 2023 Substantial Completion: August 4, 2023 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |