Similar Projects
Commonwealth Heights
New Construction
Conception
Marlborough, MA

Triple Crown Estates Phase 2
New Construction
Design
Tyngsborough, MA 01879

Webber Village
New Construction
Design
Littleton, MA

Full Renovation to the First Floor of Two Family House
Renovation
Post-Bid
Less than $130,000 est. value
Winchester, MA 01890

Domestic Hot Water (DHW) and Electrical Switchgear Replacement
Post-Bid
Less than $134,679 est. value
Kingston, Silver Lake, MA 02364

Bathroom Renovations
Renovation
Results
Less than $28,652 est. value
Dracut, MA 01826

Vacant Unit Rehab
Results
Less than $47,750 est. value
Littleton, MA 01460

Abby Road Subdivision
New Construction
Construction
Winchester, MA 02135

Two Family Units
New Construction, Demolition - 6,800 SF
Construction
$800,000 est. value
Somerville, MA

Milot Road Subdivision
New Construction
Pending Verification
Westford, MA

Thorncliff Avenue Residence
New Construction
Pending Verification
Lowell, MA 01851

Kitchen Renovations Including Flooring Abatement
Renovation
Results
Less than $180,000 est. value
Framingham, MA 01702

Village Meadows
New Construction
Pending Verification
Groton, MA 01450

Bathroom Upgrades - General Bids
Renovation
Results
Less than $213,000 est. value
Concord, MA 01742

Active Adult Housing
New Construction
Pending Verification
Framingham, MA 01702

Reported 12/11/2020 12:00 AM
Project Title

Housing Rehabilitation

Physical Address View project details and contacts
City, State (County) Lowell, MA 01852   (Middlesex County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 12/02/20
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation work to be performed on single family homes located at 6 Roper Street and 22 E Sixth Street in Lowell Massachusetts.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents