Similar Projects
Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Chester Willis Field Renovation
Infrastructure, Renovation
Design
$2,500,000 CJ est. value
Natchez, MS 39120

New Water Well
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Ashland, MS 38603

Rehabilitation of Water Well 4
Infrastructure
Bidding
$1,500,000 CJ est. value
Kosciusko, MS 39090

Hermanville Multi-Use Trail
Infrastructure
Post-Bid
$200,000 CJ est. value
Port Gibson, MS 39150

Playground Equipment and Surfacing
New Construction
Post-Bid
Less than $550,000 est. value
Natchez, MS

Abraham House of God
New Construction, Infrastructure
Results
$2,800,000 CJ est. value
Horn Lake, MS 38637

Woodland Clinic Addition
Addition, Demolition, Renovation, Infrastructure
Results
$418,500 CJ est. value
Woodland, MS 39776

McAlister's Deli / Greenwood
Demolition, New Construction, Infrastructure - 3,000 SF
Construction
$1,300,000 CJ est. value
Greenwood, MS 38930

Hernando High School
New Construction, Infrastructure
Construction
$85,211,000 CJ est. value
Hernando, MS 38632

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Stateline Business Park Building G
New Construction, Infrastructure - 352,800 SF
Pending Verification
$38,000,000 CJ est. value
Southaven, MS 38671

Commercial Park Debris Removal
Term Contract
Design
Carrollton, MS 38917

Corinth's Shiloh National Park Route Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Corinth, MS 38834

Design and Installation of Playground Equipment
Alteration
Post-Bid
Less than $550,000 est. value
Natchez, MS

Last Updated 10/13/2023 04:10 PM
Project Title

SCSD Raleigh Football Renovation Smith County School District

Physical Address View project details and contacts
City, State (County) Raleigh, MS 39153   (Smith County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $231,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

SCSD Raliegh Football Renovation Proposal shall be submitted on Bid Forms provided with the specifications. The current Certificate of Responsibility Number of the bidder shall appear on the outside of each sealed envelope containing a proposal, said envelope being plainly marked "PROPOSAL FOR" SCSD Raleigh Football Renovation. Each proposal must be accompanied by a bid bond or certified check in an amount equal to 5% of the bid, payable to the Smith County School District as bid security. A Payment and Performance Bond in an amount equal to 100% of the contract price shall be required of the successful bidder. The Contract will be awarded to the lowest, best and acceptable bidder, except that the Smith County School District reserves the right to waive any informality in the bidding and to reject any and all bids. SMITH COUNTY SCHOOL DISTRICT Mr. Nick Hillman, Superintendent of Education The Project consists of the the renovations to the existing Raleigh Football Stadium located in Raleigh, Mississippi as indicated in construction drawings and specifications. Projects include all general construction, civil, mechanical and electrical work per plans and specifications

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents