Similar Projects
Parking Lot Reconstruction Phase 3 at Pisctaway Campus
Bidding
Piscataway, NJ 08854

Pulda Farm Walking Trail Improvements
Bidding
North Brunswick Township, NJ 08902

Woodbridge Bicycle Connect
Post-Bid
Woodbridge, NJ 07095

Pine Avenue Pedestrian and Roadway Improvements
Post-Bid
South Amboy, NJ 08878

2018 Annual Curb Replacement
Results
Old Bridge, NJ

ADA Ramps Improvement at Various Locations
Results
New Brunswick, NJ 08901

Primary School Parking Lot Reconstruction at the South River School District
Bidding
South River, NJ 08882

Arts District Streetscape Improvements Phase I
Post-Bid
Carteret, NJ 07008

New Market Lake Retaining Wall and Parking Lot Improvements
Results
Piscataway, NJ 08854

Repair to Campus Walkways and Roadways
Bidding
Edison, NJ 08818

Paver Replacement at the Sayreville Center for Lifelong Learning
Post-Bid
$115,000 est. value
Sayreville, NJ 08872

Parking Lot Asphalt Pavement Crack Filling
Results
Edison, NJ 08817

Lenape Trail Improvements
Post-Bid
Plainsboro, NJ

2019-2021 Road Program for Curbs, Sidewalk, Driveway and ADA Ramps Improvements
Results
Piscataway, NJ

2019 Annual Curb Replacement Program
Term Contract
Post-Bid
Old Bridge, NJ 08857

Last Updated 08/01/2019 09:12 AM
Project Title

Parking Lot Improvements Woodbridge Avenue Pump Station

Physical Address View project details and contacts
City, State (County) Woodbridge, NJ 07095   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Project generally consists of removal of 5" existing pavement and replacing with 3" base and 2" surface course including storm sewer improvements. Reconstruction of the parking lot generally consists of milling/unclassified excavation and paving, the furnishing and installation of dense graded aggregate base course, hot mix asphalt base course, and hot mix asphalt surface course including sweeping, tack coating, and other pavement and preparation and related work.. Reconstruction also includes the removal and replacement of curbs and sidewalks, driveway restoration, storm drainage improvements, striping, chain link fence and a motorized gate and other associated work and services in accordance with the Contract Documents. The proposed storm sewer improvements generally consist of the new storm sewer with inlets, including connection to the existing storm sewer, excavation bracing, vibration monitoring, and other associated work.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents