Similar Projects
New Bedford Hurricane Barrier Dewatering
Design
$1,000,000 to $5,000,000 est. value
New Bedford, MA

Corrugated Polyethylene Pipe
Bidding
Leicester, MA

Brooks and Culverts Maintenance
Bidding
$100,000 est. value
Needham, MA

Drainage Structures
Post-Bid
$800,000 est. value
Lowell, MA

Culvert Cleaning and Maintenance Contract
Post-Bid
Lexington, MA

Route 31 Culvert Replacement
Results
$816,014 est. value
Princeton, MA 01541

Scheduled and Emergency Drainage Structure and Pipe Cleaning at various Locations
Results
Less than $900,000 est. value

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Bidding
$680,575 est. value

Foster Avenue Revetment Improvement Project
Post-Bid
Less than $800,000 est. value
Marshfield, MA 02050

Culvert and Drainage Repairs and Improvements at Various Locations along Interstate 90
Results
Less than $2,038,440 est. value

Drainage Improvements on Spectacle Hill Road and South Bolton Road
Bidding
Bolton, MA

Drainage Pipe
Post-Bid
Royalston, MA

Herring Passage and Smelt Habitat Restoration
Results
$2,666,332 est. value
Weymouth, MA 02188

Round Pond Retaining Wall Partial Reconstruction
Post-Bid
Less than $340,000 est. value
Milford, MA

Stormwater Drainage Improvements and Related Work Along Section of Routes 24 and 79 and Interstate 195
Results
Less than $1,319,000 est. value
East Freetown, Fall River, Somerset, MA 02717

Last Updated 07/22/2020 10:03 AM
Project Title

Scheduled and Emergency Drainage Structure Reconstruction and Repairs at Various Locations

Physical Address View project details and contacts
City, State (County) (Bristol, Middlesex, Norfolk, Plymouth, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $637,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"40.000","Cy","Gravel Borrow","151." "60.000","Ea","Drainage Structure Adjusted","220." "1100.000","Ft","Drainage Structure Rebuilt","220.2" "20.000","Ea","Frame And Cover","221." "20.000","Ea","Frame And Cover - Secured","221.1" "75.000","Ea","Frame And Grate - Massdot Bar Type","222." "75.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "190.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "300.000","Ton","Hma For Patching","451." "5.000","Ea","Granite Curb Inlet - Straight","514." "20.000","Ea","Curb Inlet Removed And Reset","581." "1.000","Ls","Equipment For Engineers Field Office","747." "5.000","Ea","Emergency Response","748.1" "20.000","Ft","Sediment Control Barrier","767.121" "320.000","Sf","Safety Signing For Traffic Management","852." "100.000","Day","Truck Mounted Attenuator","853.403" "10.000","Day","Temporary Illumination For Work Zone","853.8" "200.000","Day","Arrow Board","856." "2000.000","Day","Reflectorized Drum","859." "200.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1"

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents