Similar Projects
International Drive Booster Pump Station
Bidding
Myrtle Beach, SC 29572

Plant Control Pump Station – Pump Base Improvements
New Construction
Bidding
Charleston, SC

Pump Station 151 Upgrade
Renovation
Post-Bid
Summerville, SC 29486

Sullivan`S Island Wastewater Lift Station Conversions
Post-Bid
Charleston, SC 29482

Waterloo + Milam Road Booster Pump Stations
Results
SC

Pump Station 002 Replacement
New Construction
Results
Goose Creek, SC

South Darlington Pump Stations Renovations
Renovation
Bidding
$1,200,000 to $1,400,000 est. value
Darlington, SC

Woodside Pump Station Upgrade
New Construction
Post-Bid
North Charleston, SC 29405

Upgrade of Hurricane Creek Pump Station
Results
$1 to $1,000,000 est. value
Anderson, SC 29621

Buchanan Bridge Pump Station and Force Main
Renovation
Bidding
Less than $400,000 est. value
Chesterfield, SC

McRae Road Pump Station Upgrade
Post-Bid
Camden, SC 29020

Phase 2 - Kraft-Heinz Ground Storage Tank and Pump Station
Results
Newberry, SC

Sewer Pump Station Modification at City of Conway Marina
Renovation
Bidding
Conway, SC 29526

Haddon House Pump Station Upgrade
Post-Bid
Less than $550,000 est. value
Richburg, SC

Dunwoody Oaks Pump Station Elimination
Results
Greenville, SC

Last Updated 12/04/2019 08:38 AM
Project Title

Piedmont #5 PS Odor and Corrosion Control

Physical Address View project details and contacts
City, State (County) Greenville, SC   (Greenville County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be done in accordance with these Specifications consists of furnishing all equipment, superintendence, labor, skill, material and all other items necessary for the construction of the Piedmont #5 PS Odor and Corrosion Control Project. The Contractor shall perform all work required for such construction in accordance with the Contract Documents and subject to the terms and conditions of the Contract, complete and ready for use. The principal features of the Work to be performed includes, but is not limited to, the following: A Carbon Adsorption system including an FRP activated carbon adsorption vessel, FRP centrifugal fans, FRP grease filter/mist eliminator, FRP ductwork, electrical, Instrumentation and Controls, sitework and appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Process Corrosion Protection.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents