Similar Projects
1121 Electric Avenue Warehouse and Office
New Construction, Infrastructure - 17,774 SF
Design
$3,000,000 CJ est. value
Wayland, MI 49348

Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders and Pavement Markings on 136th Avenue
Infrastructure
Bidding
$994,000 CJ est. value
Hopkins, MI 49328

Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders and Pavement Markings on 136th Avenue
Infrastructure
Bidding
$994,000 CJ est. value
Hopkins, MI 49328

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

0.13 Mi of Bridge Rehabilitation and Road Reconstruction Including Replacing the Bridge Decking With Laminated Wood and Steel Grating, Hot Mix Asphalt Cold Mill and Resurface, Concrete Curb and Gutter and Pavement Markings
New Construction, Infrastructure
Post-Bid
Allegan, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water And Wastewater Asset Management Plan Services
Results
MI

Harvest Meadows Phase II Condominiums
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Leighton Township, MI 49348

Fastool Building Addition
Addition, Demolition, Infrastructure - 7,100 SF
Pending Verification
$1,000,000 CJ est. value
Wayland, MI 49348

2023 Asphalt Repairs
Infrastructure
Bidding
$1,000,000 CJ est. value
Saugatuck, MI 49453

66th Street Water Special Assessment District No. 1
Alteration
Post-Bid
Saugatuck, MI

Paving Service
Infrastructure
Results
Allegan, MI 49010

2023 Bond - Hamilton Community Schools
Renovation, Infrastructure
Pending Verification
$41,180,000 CJ est. value
Heath Township, MI 49419

Union Street Sidewalk
Infrastructure
Post-Bid
Douglas, MI

5.15 MI of Hot Mix Asphalt Reconstruction, Cold Milling and Resurfacing, Culvert Replacement, Guardrail and Pavement Markings on M-89 from West of 58th Street to I-196 East
Infrastructure
Results
Fennville, MI

Last Updated 05/03/2023 09:39 AM
Project Title

333 Blue Star Highway Sidewalk

Physical Address View project details and contacts
City, State (County) Douglas, MI 49406   (Allegan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $98,327 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 3, 2023, the project has been awarded. A timeline for construction has not been confirmed. The project consists of furnishing all material and constructing the following: Approximately 426 feet of 15" storm sewer Strip topsoil, place fill, and restore for the sidewalk installation. Add alternate for 630 lineal feet of 5' wide 4" concrete sidewalk Including all necessary appurtenances and restoration. The work to be performed under this contract will be financed and paid for by funds received from City of Douglas. A bid bond, certified check, or cashier's check payable to City of Douglas in an amount equal to five percent (5%) of the total price must accompany each bid. This surety must bind the bidder for a period of forty-five (45) days after the receipt of bids. The project must be completed by June 9, 2023, or 30 days from the start of construction; whichever comes first. Prein&Newhof members who want to purchase the hard copy of the drawings only, may do so for $9.00 dollars. A $15 dollar charge will be added to all 2 mailed drawings and/or specifications. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents