Project Title | Alpena Armory - Renovate Armory |
Physical Address | View project details and contacts |
City, State (County) | Alpena, MI 49707 (Alpena County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,169,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Addition of vehicle storage garage, reconfigure existing toilet and shower rooms, provide space for a lactation room, renovate offices and lobby, renovate classrooms, replace existing vault door, related MEP upgrades, parking lot improvements including security measure upgrades and paving renovations Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Tim Miller at tmiller@sidockgroup.com no later than 5:00 p.m., Eastern August 25, 2023. Addition of vehicle storage garage, reconfigure existing toilet and shower rooms, provide space for a lactation room, renovate offices and lobby, renovate classrooms, replace existing vault door, related MEP upgrades, parking lot improvements including security measure upgrades and paving renovations per drawings and specifications dated 8-1-2023. Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Tim Miller at tmiller@sidockgroup.com no later than 5:00 p.m., Eastern August 25, 2023. Furnish all equipment, materials, labor, and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation, and disposal of the waste generated at the construction site for the Owner's review and approval. The Contractor will be required to produce waste management progress reports. |
||||||||||||||||||||||||||||||||||||
Details | 20,524 SF.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |