Similar Projects
Add a Turning Lane on Us 150 at Wilderness Trail Road (18CCN)
Infrastructure
Conception
$370,000 CJ est. value
Stanford, KY 40484

Add a Turning Lane on Us 150 at Wilderness Trail Road (18CCN)
Infrastructure
Conception
$370,000 CJ est. value
Stanford, KY 40484

Foster Lane Sidewalk Project
Infrastructure - 1,332 SF
Post-Bid
$500,000 CJ est. value
Stanford, KY 40484

Foster Lane Sidewalk Project
Infrastructure - 1,332 SF
Post-Bid
$500,000 CJ est. value
Stanford, KY 40484

Asphalt Resurfacing - Junction City to Standford Road (US 150)
Infrastructure
Results
Stanford, KY 40484

Asphalt Resurfacing - Junction City To Standford Road (Us 150) (Mp 0.000)
Infrastructure
Results
Stanford, KY 40484

Us 150 New Turning Lane Near Hobble Road and Crawford Lane (18CCN)
Infrastructure
Conception
$350,000 CJ est. value
Stanford, KY 40484

Footings, and Abutments and Install the Super Structure
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Stanford, KY 40484

Wellness Center Building
Addition - 2,200 SF
Results
$295,000 est. value
Stanford, KY 40484

New Turning Lane at Arcadia View Drive (18CCN)
Infrastructure
Conception
$840,000 CJ est. value
Hustonville, KY 40437

Lincoln County High School Field & Track Improvements
Infrastructure
Post-Bid
$60,000 CJ est. value
Stanford, KY 40484

Asphalt Resurfacing - Stanford Road (US 27)
Infrastructure
Results
KY

Lincoln County High School Press Box
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Stanford, KY 40484

Waynesburg Road (US 27) (MP 0.000)- Asphalt Resurfacing
Infrastructure
Results
KY

Family Dollar/Dollar Tree #33603 / Crab Orchard
New Construction, Infrastructure - 10,500 SF
Post-Bid
$2,000,000 CJ est. value
Crab Orchard, KY 40419

Last Updated 03/15/2023 02:08 PM
Project Title

Cumberland Family Medical Center - Lincoln First Choice

Physical Address View project details and contacts
City, State (County) Stanford, KY 40484   (Lincoln County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $8,233,351 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

For Lincoln First Choice Cumberland Family Medical Center, Inc. will receive bids for construction of the Lincoln First Choice in Stanford, Kentucky. This project consists of the following bid packages: earthwork, asphalt, concrete, masonry, structural steel, general construction, roofing, storefront and windows, drywall, acoustical ceiling, floor coverings, painting, casework, plumbing, HVAC and electrical. A detailed project schedule will be compiled before construction begins; our anticipated overall time frame is fourteen (14) months from commencement to substantial completion. All questions need to be submitted in writing to shonaker@cfmcky.com no later than 10:00 AM EST, March 1, 2023. The bid shall be submitted on the bid form provided by Cumberland Family Medical Center, Inc. in the specification book. If the bid amount is over $250,000.00 the bidder will need to supply a 5% bid bond and successful contractor will be required to provide a 100% Performance & Payment Bond. Supplies broken out for Owner direct purchase are not required to be included in the Performance and Payment Bond. The Owner reserves the right to reject any and all bids or to waive any informality in the bidding. No bid may be withdrawn for a period of sixty days subsequent to the opening of bids without consent of Cumberland Family Medical Center, Inc. Progress payments on the project will be allowed with 10% retainage being withheld. A schedule of values must be submitted and approved before the first pay application will be accepted. AIA pay application or approved equal will be required to be submitted. Direct any questions affecting the preparation of your proposal to Ms. Sandra Honaker, Director of Facilities Management, phone 270-858-6655 x 2314, cell 270-507-8012 or shonaker@cfmcky.com. Addendum #1-#2 have been issued as of 3-9-2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents