Similar Projects
J Avenue Filter Building Roof Replacement - City of Cedar Rapids
Alteration
Conception
$1,250,000 est. value
Cedar Rapids, IA 52402

AW Family Aquatic Center Roof Replacement - 23072- City of Davenport
Infrastructure
Conception
Less than $150,000 est. value
Davenport, IA 52803

Cascade Library Addition
Addition - 4,778 SF
Design
Cascade, IA

Gibson Memorial Library
Renovation, Addition - 8,000 SF
Design
$4,700,000 est. value
Creston, IA 50801

Water Pollution Control Facility Operations Roof Replacement
Renovation
Sub-Bidding
$175,000 CJ est. value
Ottumwa, IA 52501

IVH(Iowa Veterans Home) Pedestrian Tunnels Waterproofing
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Marshalltown, IA 50158

Roof Tear-Off and Replacement
Alteration
Post-Bid
Clinton, IA

Sheriff Office - Roof Removal and Replacement
Alteration
Post-Bid
Dubuque, IA 52001

Young Arena Southeast and Southwest Roof Replacement
Alteration
Results
Waterloo, IA 50701

Residential Roof Removal and Replacement
Alteration
Results
IA

Library Roof - City of Johnston
Infrastructure
Conception
$145,000 est. value
Johnston, IA 50131

2022 Roof Replacement at Gaylord Smith Building
Alteration
Post-Bid
Sioux City, IA 51106

2021 College Community Roof Improvements
Alteration
Results
$630,000 est. value
Cedar Rapids, IA 52404

Library Branch Carpet Replacement - FP029 - City of Davenport
Renovation
Conception
$325,000 est. value
Davenport, IA 52801

Grimes Public Library - Elevator
Renovation, Alteration
Post-Bid
Grimes, IA

Last Updated 08/09/2022 06:02 PM
Project Title

2022 Spencer Library Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Spencer, IA 51301   (Clay County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Library - Public, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Removing and replacing the existing EPDM Rock Ballasted Roof on the public library. The total roof area is approximately 13,000 square feet. The replacement roof shall be a single ply EPDM, TPO or PVC membrane roof system with a 20 year Warranty and 90 mph design wind speed. The contractor shall have 21 consecutive calendar days to complete the Work. Said 21 days shall be between September 6, 2022 and July 1, 2023. It is the Owner's preference to have the work completed prior to December 1, 2022. The contractor shall complete all work covered by the contract on or before the 22nd calendar day following the commencement of work at the site, or July 1, 2023, whichever comes first. All work is to be done in strict compliance with the plans and specifications that have been approved by the City Council and are now on file for public examination in the City Clerk's Office. Each proposal/bid shall be submitted in a sealed envelope to the City Clerk on or before the time herein set for said letting. Each proposal/bid shall be made on a proposal form furnished by the Engineer for use on this project. Each proposal shall be accompanied by a cashier's check or certified check on a solvent Iowa bank or a bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond in the form prescribed in the specifications (see Chapter 26 of the current Code of Iowa) and filed in an envelope separate from the one containing the proposal, sealed, and in the amount of not less than 5 percent of the bid. The check or bid bond shall be made payable to the Treasurer, City of Spencer, Iowa. Said check may be cashed or the bid bond declared forfeited by the City as liquidated damages in the event the bidder fails or refuses to enter into a contract as required by the specifications within fifteen (15) days of the award of a contract. The Contractor shall furnish a Performance and Payment Bond (see Chapter 573 of the current Code of Iowa), in an amount equal to one hundred percent (100%) of the amount of the contract, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall protect and save harmless the CITY, and KRUSE, CATE & NELSON, P.C., Spencer, Iowa, from claims and damages of any kind caused by the construction of said improvements, and shall also guarantee the maintenance of said improvement in good repair for not less than two (2) years from the date of final acceptance of the improvement by the City Council. This is in addition to the roof manufacturer's 20 Total System Warranty for the roof. The City Council reserves the right to defer acceptance of any proposal for a period not to exceed thirty-one (31) days from the date for bid opening. In addition, until the award of a contract is made, the owner reserves the right to reject any or all proposals, waive technicalities, if such waiver is in the best interest of the owner and is in conformance with applicable state and local laws or regulations pertaining to the letting of construction contracts; advertise for new proposals; or proceed with the work otherwise. All such actions shall promote the owner's best interests. The Contractor shall observe the laws of the State of Iowa with reference to "Occupational Safety and Health Standards". By virtue of statutory authority, a preference will be given to products and provisions and coal produced within the state of Iowa. Payment to the Contractor for these improvements will be made in cash from such funds as are legally available for such purpose. Final payment of the five percent (5%) due the Contractor will be made not earlier than thirty days from the final acceptance of the work by the City, subject to the conditions and in accordance with the provisions of Chapters 26 and 573 of the current Iowa Code. Contractors shall use their best efforts to solicit bids from and to utilize minority group contractors and subcontractors, or contractors and subcontractors with meaningful minority group and female representation among their employees. The City of Spencer, Iowa, does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in employment or the provision of services. The City of Spencer, Iowa, does not discriminate on the basis of disability in the admission or access to, or treatment or employment in, its programs or activities. The City Manager has been designated to coordinate compliance with the non-discrimination requirements contained in section 35.107 of the Department of Justice regulations. Information concerning the provisions of the American with Disabilities Act, and the rights provided thereunder, are available from the ADA coordinator.

Details

13,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents