Similar Projects
Escambia County Department Supplies
Term Contract
Sub-Bidding
Cantonment, FL 32533

Water Main Materials for Bob Sikes Bridge
Term Contract
Sub-Bidding
Pensacola, FL 32501

Pressure Wash Exterior of the Escambia County Jail
Term Contract
Post-Bid
Pensacola, FL 32501

Main Library Down Town
Infrastructure, Alteration
Post-Bid
Pensacola, FL 32502

ECAT Facility Pressure Washing and Painting
Alteration
Results
Pensacola, FL

Portable Toilet Clean Out and Septic Services
Term Contract
Post-Bid
FL

Pensacola Bay Center - Pressure Washing Services
Term Contract, Alteration
Post-Bid
Pensacola, FL 32502

Clean and Apply Coating the Exterior of Building 3700 Warrington Campus
Alteration
Post-Bid
Pensacola, FL 32507

Portable Toilets
Term Contract
Post-Bid
FL

M.C. Blanchard Judicial Building - Pressure Washing
Term Contract
Post-Bid
Pensacola, FL 32502

Window Washing
Term Contract
Post-Bid
Pensacola, FL 32502

Escambia County Emergency Command Building - Pressure wash
Term Contract
Post-Bid
Pensacola, FL 32505

General Moving Services and Supplies
Term Contract
Post-Bid
Pensacola, FL

2021 - 2022 Athletic Field Maintenance
Term Contract
Post-Bid
Pensacola, FL 32501

EE Property Clean ups and Demolitions
Term Contract
Post-Bid
Pensacola, FL 32507

Last Updated 10/06/2022 01:32 PM
Project Title

EE Property Clean ups and Demolitions

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32501   (Escambia County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and legal disposal of all nuisance conditions such as trash, debris, rubbish, items holding water or no longer being used for it's intended purpose. Removal and legal disposal of all overgrowth. clearing along all fence rows and/or property lines. This includes all underbrush, scrub oaks, overgrowth around all trees, and premiters of any structures. Board up any broken windows or open doors with 1/2" CDX plywood. Remove and dispose of all vines on gates. Grounds to be left clean of any clippings, cuttings, sticks, or other debris, this includes walkways, sidewalks, and road way. Any ruts, holes, or uneven areas caused by contractors equipment or due to cutting and cleaning should be left smooth and even so property can be easily maintained in the future. This scope is provided only as a general guide to cleanup. Additional information could be discussed and added during the mandatory property walkthrough, taking notes is encouraged. Ensure all utilities are disconnected and inspections are completed as required. Demolition and legal disposal of all structures described in mandatory walk-through. Obtain septic tank abandonment permit from Healt Department, have tank pumped and inspected. Photograph all stages of tank abandonment. Removal and legal disposal of all nuisance conditions such as trash, debris, rubbish, items holding water or no longer being used for it's intended purpose. Removal and legal disposal of all overgrowth. clearing along all fence rows and/or property lines. This includes all underbrush, scrub oaks, overgrowth around all trees, and perimeters of any structures. Remove and dispose of all vines on gates. Grounds to be left clean of any clippings, cuttings, sticks, or other debris, this includes walkways, sidewalks, and road way. Any ruts, holes, or uneven areas caused by contractors equipment or due to cutting and cleaning should be left smooth and even so property can be easily maintained in the future. Grade out lot after demolition.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents