Similar Projects
Relocate Grease Trap FPC
Alteration
Design
$250,000 to $500,000 est. value
Marianna, FL 32446

Sanitary Collection System Improvements, Phase 2A, Water Distribution System Improvements, Phase 1A
Infrastructure
Bidding
$8,000,000 est. value
Arcadia, FL

Corrections Genesis Sanitary Pipe Replacement
Infrastructure
Bidding
$1,800,000 est. value
Orlando, FL 32839

Septic Services
Term Contract
Post-Bid
Miami, FL

Sanitary Sewer Collection System Rehabilitation
Post-Bid
FL

60-Inch Force Main (NL-1A) (West Segment) along Northwest 162 Street from Northwest 6 Avenue to Northwest 8 Avenue
Results
Less than $21,954,755 est. value
Miami, FL 33169

General Contractor - Utility Systems
Term Contract
Results
Cocoa, FL 32922

Thermal Utility System Improvements
Construction
Gainesville, FL 32611

RIVERTOWN MAIN STREET Phase 3
New Construction
Construction
Jacksonville, FL

Cured-In-Place Lateral Lining Term Contract
Term Contract
Bidding
FL

LS 57 SW Quad Gravity Sewer Rehabilitation Project
Post-Bid
$3,055,000 est. value
Orlando, FL

2018-2019 Sewer System Improvements
Results
$1,398,282 est. value
New Port Richey, FL 34652

Roosevelt Estate 7th Street Utility Improvement
Infrastructure
Bidding
West Palm Beach, FL 33422

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

Infiltration Removal Lateral and Mainline Lining Program
Term Contract
Results
Less than $3,169,282 est. value
Pembroke Pines, FL 33025

Last Updated 04/14/2022 08:01 AM
Project Title

Spring Hill WRF Wastewater Flow Diversions

Physical Address View project details and contacts
City, State (County) FL   (Hernando County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $284,460
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of eight (8) force main connections and one (1) force main interconnection on Commercial Way (US 19) and on Tarpon Boulevard,

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents