Similar Projects
Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Northside Complex Splash Park - 250696 - City of Saint Joseph
Infrastructure
Conception
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

Osage Beach 2022 Pavement Maintenance Program - Rebid
Infrastructure
Design
$2,000,000 CJ est. value
Osage Beach, MO 65065

General Site - Research Commons Thermal Plant
New Construction, Infrastructure
Bidding
$12,636,825 CJ est. value
Columbia, MO 65203

USDA-ARS Research Lab
New Construction, Infrastructure - 25,000 SF
Bidding
$25,000,000 CJ est. value
Columbia, MO 65203

Pavement Marking
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Harrisonville, MO 64701

Emergency Water Supply Connection
Infrastructure
Post-Bid
Hamilton, MO

Earth Moving Services - Multi Year
Term Contract, Infrastructure
Post-Bid
Columbia, MO

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Battle Park Site Work - Phase 1
Infrastructure
Results
Columbia, MO 65202

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Extend Hinkson Creek Substation Feeders - E0193 - 1837 - City of Columbia
Infrastructure
Conception
$10,000,000 CJ est. value
Columbia, MO 65203

Warehouse and Enclosed Equipment Parking - E0176 - 1593 - City of Columbia
New Construction, Infrastructure
Design
$4,800,000 CJ est. value
Columbia, MO 65203

Last Updated 12/20/2022 05:35 PM
Project Title

Wastewater System Improvements - Contract 2

Physical Address View project details and contacts
City, State (County) Campbell, MO 63933   (Dunklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Contract 2 - Wastewater Collection System Improvements - including open cut point repair, CIPP linings, Pipe Grouting, Manhole repairs, and service line repairs. Bids shall be on unit price and lump sum price basis. The Issuing Office for the Bidding Documents is the office of the Engineer, Waters Engineering, Inc., P. O. Box 567, 908 South Kingshighway, Sikeston, MO 63801, telephone 573.471.5680, E-mail: main@waterseng.com. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 AM and 5:00 PM, and may obtain copies of the Bidding Documents from the Issuing Office as described below. Bidding Documents also may be examined at the Campbell City Hall, on Mondays through Fridays between the hours of 10:00 AM and 3:00 PM. The shipping charge amount will depend on the shipping method selected by the prospective Bidder. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and Davis Bacon and State Prevailing wage rates to be paid under the contract, Segregated Facility, Section 109, and E.O. 11246. MBE, WBE and Section 3-DBE bidders are encouraged to bid. Bidders should note the new requirements for OSHA training of workmen and the requirements prohibiting the employment of unauthorized aliens prohibited including the submission of an Affidavit of Work Authorization with their bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. No pre-bid conference will be held. Bid security shall be furnished in accordance with the Instructions to Bidders.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents