Similar Projects
Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

WP-4 Reservoir and Associated Improvements
Infrastructure
Design
$200,000 CJ est. value
Omaha, NE 68102

WP-4 Reservoir and Associated Improvements
Infrastructure
Design
$200,000 CJ est. value
Omaha, NE 68102

2022 Part 2 Improvements - 56th Street & Avenue N Turning Lanes
Infrastructure
Bidding
$560,000 CJ est. value
Kearney, NE 68847

2022 Part 2 Improvements - 56th Street & Avenue N Turning Lanes
Infrastructure
Bidding
$560,000 CJ est. value
Kearney, NE 68847

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

NP Dodge Park Waterline Replacement
Infrastructure
Results
Omaha, NE 68112

2021 Cemetery North Addition - Phase I
Addition, Infrastructure
Results
Kearney, NE

Costco Wholesale Off-Site Parking Lot / Omaha
Infrastructure - 153,409 SF
Construction
$200,000 CJ est. value
Omaha, NE 68154

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

David City Wastewater Treatment Plant (WWTP)
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
David City, NE 68632

Replace and Upgrade Main on Marian Road from 7th Street to 9th Street - City of Hastings
Infrastructure
Conception
$350,000 CJ est. value
Hastings, NE 68901

Last Updated 11/22/2022 12:01 PM
Project Title

Wastewater Lagoon Improvements

Physical Address View project details and contacts
City, State (County) Gresham, NE 68367   (York County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

"As of November 22, no bids received. A timeline for the rebid date of this project is not yet available." For furnishing all equipment, labor, materials and appurtenances required to construct an influent discharge structure, influent lagoon piping, install a 2 mixer in the existing lift station, and other such work as may be incidental to Wastewater Lagoon Improvements The Owner reserves the right to reject any or all bids; and to waive irregularities or informalities to accept the BID it deems most beneficial. Bids received after the specified time of closing will be returned unopened. Each BIDDER will be required to submit with his proposal, a certified check, cashiers check or bid bond made payable, without condition, to the Village Clerk, Gresham, Nebraska, in an amount equal to five percent (5%) of the proposal. Contractors and subcontractors on USEPA federally assisted construction projects are required to pay their laborers and mechanics wages not less than those established by the U.S. Department of Labor. A current wage decision containing the appropriate building and/or heavy type rates is included in the specifications for bidding purposes. The prospective participants must certify by submittal EPA Form 5700-49, Certification Regarding Debarment, Suspension and Other Responsibility Matters, that to the best of its knowledge and belief that ! it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency. BIDDERS on this work will be required to comply with the Presidents Executive Order No. 11246. | Requirements for bidders and contractors under this order are explained in the specifications. Each BIDDER must fully comply with the requirements, terms and conditions of the U.S. Environmental | Protection Agency, Disadvantaged Business Enterprise (DBE) requirements, including the fair share objectives for disadvantaged business participation during the performance of this contract. The bidder . commits itself of the fair share objective for disadvantaged business participation contained herein and all other requirements, terms and conditions of these bid conditions by submitting properly signed bid. The owner is an equal oppportunity employer and requires all contractors and consultants to comply with all applicable Fedral and state laws and regulations

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents