Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Jail RTU Air Handler Controls upgrade to VFD
Renovation
Sub-Bidding
$70,000 CJ est. value
Grand Rapids, MI 49503

Junior/Senior High School Boiler Replacement Escanaba Area Public Schools
Demolition, Renovation
Sub-Bidding
$400,000 CJ est. value
Escanaba, MI 49829

Horizontal Unit Ventilator
Alteration
Post-Bid
Clio, MI 48420

Clio High School Area F Air Conditioning Renovation
Alteration
Post-Bid
Clio, MI

Upgrade to Potable Water Risers Construction
Alteration
Results
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

TCF - Kitchen MAU and Library AC
Alteration
Results
Lapeer, MI 48446

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

Air Compressor and Installation
Renovation
Sub-Bidding
$650,000 CJ est. value
Bay City, MI 48708

CN Data Center Cooling
Alteration
Post-Bid
Clinton Township, MI

Stevenson High School PAC AHU Upgrade
Alteration
Results
Sterling Heights, MI 48313

New Boiler for Perry Innovation Center
Renovation
Sub-Bidding
$500,000 CJ est. value
Grand Blanc, MI 48439

Duct Cleaning Services, Hvac System
Alteration
Post-Bid
Grand Rapids, MI

HVAC Renovations - Air Conditioning
Alteration
Results
Alma, MI 48801

Hvac Replacement, City of Fenton Water Treatment Plant
Renovation
Sub-Bidding
$300,000 CJ est. value
Fenton, MI 48430

Last Updated 08/18/2023 09:26 AM
Project Title

Boiler and Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Wyoming, MI 49519   (Kent County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $298,616 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 18 2023, the project has not yet been awarded. A timeline for award has not yet been established.** All bids must be accompanied by a negotiable bid guarantee which shall not be less than five percent (5%) of the amount of the bid a performance and payment bond in a penal sum of 100 percent of the contract price or, as may be required or permitted by State law Refer to Prevailing Wage Requirements included herein All principal contractors and subcontractors are strongly encouraged to visit the site to review the scope of work. This will be the only time the sites would be available for inspection during the bid period. The Wyoming Housing Commission reserves the right to reject any or all bids, to award the contract to the lowest, responsible and most responsive bidder and to waive any formalities or irregularities in the bids received. The Housing Commission reserves the right to award a contract in the best interest to the Housing Commission

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents