Similar Projects
Vicinia
New Construction
Conception
San Antonio, TX 78251

Citadel Urban
New Construction
Design
San Antonio, TX

Urbana at West Pointe
New Construction
Design
San Antonio, TX 78253

UTEX Apartments
New Construction - 177,239 SF
Post-Bid
San Antonio, TX 78249

District 9 Senior Center
New Construction - 26,337 SF
Results
Less than $8,975,000 est. value
San Antonio, TX 78205

Mission Del Lago Unit 15 (T.I.F.)
Results
San Antonio, TX 78200

Artisan at Ruiz
New Construction - 106,455 SF
Construction
$12,700,000 est. value
San Antonio, TX 78207

Villas at Echo East
New Construction - 195,627 SF
Construction
$23,000,000 est. value
San Antonio, TX 78220

Snowden Senior Apartments
New Construction - 162,900 SF
Pending Verification
$23,875,700 est. value
San Antonio, TX 78240

Escala Ranch Apartments
New Construction - 309,509 SF
Pending Verification
$50,000,000 est. value
San Antonio, TX 78251

World Heritage Center
New Construction - 9,000 SF
Design
$8,000,000 est. value
San Antonio, TX 78214

Rehabilitation of Fire Damaged Unit 919 Chihuahua at the Alazan Apache Apartments
Results
Less than $128,400 est. value
San Antonio, TX 78207

Katherine Court Apartment Complex
New Construction
Pending Verification
Alamo Heights, TX 78209

Villita Tower Mixed Use Development
New Construction - 4,600 SF
Design
$89,000,000 est. value
San Antonio, TX 78205

Mission Del Lago Unit 11D (T.I.F.)
Results
San Antonio, TX 78200

Reported 04/22/2022 09:19 AM
Project Title

Avanti Silver Heights

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78213   (Bexar County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, 3 Stories Above Grade, New Construction, 90 Unit(s), Clubhouse/Social Club, 1 Story Above Grade, 4,729 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents