Similar Projects
Maple Street Phase I, II, III - Town of Killingly
Infrastructure
Conception
$6,500,000 CJ est. value
Killingly, CT 06239

Maple Street Phase I, II, III - Town of Killingly
Infrastructure
Conception
$6,500,000 CJ est. value
Killingly, CT 06239

Killingly Energy Center
New Construction, Infrastructure
Design
$500,000,000 CJ est. value
Killingly, CT 06241

Killingly Energy Center
New Construction, Infrastructure
Design
$500,000,000 CJ est. value
Killingly, CT 06241

RFP Engineering - Main Street Reconstruction
Infrastructure
Bidding
$600,000 CJ est. value
Thompson, CT 06255

RFP Engineering - Main Street Reconstruction
Infrastructure
Bidding
$600,000 CJ est. value
Thompson, CT 06255

Manship Park Tennis and Basketball Court Construction Project
Infrastructure
Post-Bid
$128,205 CJ est. value
Canterbury, CT 06331

Manship Park Tennis and Basketball Court Construction Project
Infrastructure
Post-Bid
$128,205 CJ est. value
Canterbury, CT 06331

Runway 6/15 - Off Airport Obstruction Removal Bradley International Airport
Infrastructure
Results
$1,891,750 CJ est. value
Windsor Locks, CT 06096

Runway 6/15 - Off Airport Obstruction Removal Bradley International Airport
Infrastructure
Results
$1,891,750 CJ est. value
Windsor Locks, CT 06096

Mini Split Heaters and Air Conditioners - North Windham Elementary School - Windham Public Schools
Addition, Demolition, Infrastructure
Conception
$525,000 CJ est. value
North Windham, CT 06256

Replacement of Bridge No. 02128 Carrying Route 12
Infrastructure
Bidding
$1,800,000 CJ est. value
Thompson, CT 06277

RFP D/B - Skate Park Expansion
Infrastructure
Post-Bid
$100,000 CJ est. value
Windham, CT 06226

Installation of Emergency Generator and Fuel Storage Tank Replacement
Renovation, Infrastructure
Results
$648,672 CJ est. value
Plainfield, CT 06374

Hartley Preserve ADA-Accessible Boardwalk Nature Trail - Town of Canterbury
Infrastructure
Conception
$600,000 CJ est. value
Canterbury, CT 06331

Last Updated 06/27/2023 10:23 AM
Project Title

Goodyear Early Childhood Center (GECC) - Parking Lot Renovation

Physical Address View project details and contacts
City, State (County) Killingly, CT 06241   (Windham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Complete renovation (excavate, install new subgrade, compact and pave), including loam and seeding all edges of a 17,775 square foot parking lot Background Goodyear Early Childhood Center is home to 130 preschool students. The current parking lot for faculty and parents is in disrepair, creating unsafe conditions for our youngest learners, parents, and staff. B. Project Description Killingly Public Schools is seeking a contractor to provide a proposal to remove and dispose of existing asphalt of approximately 17,775 square feet. Excavate subgrade and supply and install finish grade and compact. Pave 1 layer of Class #1 binder compacted. Pave 1 layer of level #1 super pave compacted with below guidelines and conditions: a. Contractor to confirm square footage prior to proposal b. Removal of existing asphalt and disposal c. Excavate out 5 inches of sub grade d. Supply and install 4 inches of 1.25 inches finish grade and compact e. Pave 1 layer of Class #1 binder compacted to 2 inches f. Pave 1 layer of level #1 super pave compacted to 2 inches g. Loam and seed all edges h. Repainting of existing parking spaces and driveway markings i. All concrete curbing to stay in place and shed will stay and be paved around A mandatory pre-proposal walk-through is scheduled for June 6, 2023 at 9:00 a.m. at Goodyear Early Childhood Center 22 Williamsville Road, Rogers, Connecticut 06263. The project must be completed by August 25, 2023. Questions may be submitted by email until June 20, 2023. Questions may be submitted by email only to Mike Vassar mvassar@killinglyschools.org

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents