Similar Projects
New Booster Pump Station for SF/150 - Catawba County
New Construction
Conception
$1,600,000 est. value
Newton, NC

Sherrills Ford Road 1.0 MG Storage Tank
Infrastructure
Conception
$3,000,000 est. value
Sherrills Ford, NC 28673

865 Morgan Mixed-Use Building
New Construction, Infrastructure - 438,856 SF
Design
$120,200,000 CJ est. value
Raleigh, NC 27603

High Point University Library
Demolition, New Construction, Infrastructure - 150,000 SF
Design
$80,000,000 CJ est. value
High Point, NC 27262

P134, Construct Slocum Road Physical Security Compliance
New Construction, Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

I-95 Rest Area Redevelopment and Landscaping
Infrastructure
Bidding
$3,000,000 est. value
Rowland, NC 28383

Contractor - New Kiser Middle School - Phase II
Infrastructure, Alteration
Sub-Bidding
$55,000,000 est. value
Greensboro, NC 27408

RFQ Contractor - New Brooks Global Studies Elementary School - Phase I
New Construction, Infrastructure - 80,000 SF
Sub-Bidding
$27,000,000 CJ est. value
Greensboro, NC 27403

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Design Build Services for Mott`s Creek Pump Station Upgrades
New Construction
Post-Bid
Less than $5,900,000 est. value
Wilmington, NC 28412

Frances Haven and Farmington Pump Station Decommissioning
Results
Less than $500,000 est. value
Harrisburg, NC 28075

Wastewater Pump Station and Sewer System Improvements
Results
Grifton, NC 28530

Red Springs High School Athletic Complex
Construction
$3,000,000 to $4,000,000 est. value
Red Springs, NC 28377

Rand Village - Sitework
New Construction
Construction
Garner, NC

Local Loaf Addition
Addition, Infrastructure - 2,600 SF
Pending Verification
$800,000 CJ est. value
Charlotte, NC 28205

Last Updated 07/26/2022 01:03 PM
Project Title

Diesel Bypass Pumps Lift Stations 7022 and 8106

Physical Address View project details and contacts
City, State (County) Marine Corps Air Station Cherry Point, NC 28532   (Craven County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Diesel Bypass Pumps Lift Stations 7022 and 8106 Contract Completion Date: 365 days after award Estimated Cost Range: Between $250,000 and $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Liquidated Damages: $116 per Calendar Day Proposal Acceptance Period: 120 days from receipt of offers Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only Diesel Bypass Pumps Lift Stations 7022 and 8106 REQUEST FOR PROPOSAL MCAS Cherry Point, North Carolina Project No. 7153658 7/19/2022 o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. Requests for Information (RFIs): RFIs must be submitted by the prime contractor to the email addresses above. The cut off for RFIs is July 29, 2022 by 9:00 AM EST in order to process all inquiries by the proposal due date.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents