Similar Projects
Silver Buffalo Casino and Food Distribution Building
Term Contract, Alteration
Design
$500,000 to $1,000,000 est. value
Anadarko, OK 73005

Paving and Drainage Improvements Replacement of Bridge 120 Over Rock Creek
Infrastructure
Bidding
$900,000 est. value
Tulsa, OK

Remove and Replace Old Low Water Crossing on Highline Road
Infrastructure
Bidding
$407,000 est. value
Spiro, OK 74959

Dirt
Post-Bid
Marlow, OK

Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

Bank Protection
Results
Cherokee, OK

Grade, Drain, Surface, and Bridge SH-31: From 1.7 Miles East of the US-270 Junction, Extend Norteast near Krebs
Results
Krebs, OK

Construction of an 8 Inch Waterline Extension to Serve Steeple Gate Subdivision
Infrastructure
Bidding
$400,000 est. value
Stroud, OK

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Oklahoma City, OK 73145

Water Line Replacement
Results
McAlester, OK 74501

Concrete Pipe Replacement Program, Contract 9
Infrastructure
Bidding
$300,000 est. value
Tulsa, OK

AMI Electric and Water Meter Installation
Infrastructure
Post-Bid
Edmond, OK

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

CPN Grand to Blackberry Frontage Road PS and E
Infrastructure
Bidding
$900,000 est. value
Shawnee, OK

Sand Springs Franklin Creek Channel Improvement at Case Park Soccer Complex
Infrastructure
Post-Bid
Sand Springs, OK

Last Updated 05/14/2022 12:57 AM
Project Title

Two North Fork of the Red River Crossings and Meter System Upgrade

Physical Address View project details and contacts
City, State (County) Carter, OK   (Beckham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $310,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 - Installation of approximately 4,400 LF of 8" PVC (all materials provided by the Contractor) & 3,400 LF of 16" HDPE (16" HDPE pipe provided by the Owner, remaining materials provided by Contractor) and all appurtenances. Contract No. 2 - Replacement of approximately 1,150 conventional meters with an AMR or an AMI system.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents