Similar Projects
Hilltop Ridge Benefit District Project
Infrastructure
Bidding
Gardner, KS

Quincy Street Improvements
Infrastructure
Bidding
Pittsburg, KS 66762

Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

N1200 Road Improvements
Infrastructure
Post-Bid
Eudora, KS 66025

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

2021 Asphalt Street Maintenance Phase I
Infrastructure
Results
Manhattan, KS

2022 OP3 CIP Street Repairs and Crosswalks
Infrastructure
Bidding
$2,000,000 est. value
Wichita, KS

Linear Grading, Reinforced Concrete Pipe, Subgrade Modification
Infrastructure, Alteration
Post-Bid
Eudora, KS 66025

9th Street and UBAS Program
Infrastructure
Results
Prairie Village, KS

Street and Storm Sewer Project
Infrastructure
Bidding
$600,000 est. value
Topeka, KS

Mulberry Street Improvements
Infrastructure
Post-Bid
Valley Falls, KS

New Century Adult Detention Center Paving Improvements – Phase I
Infrastructure
Results
Olathe, KS 66061

2021 Alley Rehabilitation
Infrastructure
Bidding
$60,000 est. value
Lawrence, KS

TAPR - Bottomland Trail Improvements
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Strong City, KS 66869

2021 Outsourced Pavement Preservation Program CIP Arterial Concrete Street Repairs Phase 3
Infrastructure, Alteration
Results
Wichita, KS

Last Updated 04/21/2022 03:39 PM
Project Title

2022 CDBG Paving Improvement

Physical Address View project details and contacts
City, State (County) Great Bend, KS   (Barton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of the 19th and Harrison Intersection including; 909 S.Y. Concrete Pavement (9 ) (Reinforced), 159 L.F. Storm Sewer Improvements, and 2,277 S.F. Concrete Sidewalk. Along with Mill and Overlay Improvements of Broadway Ave. from Polk St. to Morton St. including 23,318 S.Y. of Asphaltic Milling and Asphaltic Concrete Overlay.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents