Reported 10/17/2020 12:00 AM
Project Title

Explosive Waste Incinerator Operation Support

Physical Address View project details and contacts
City, State (County) Picatinny Arsenal, NJ 07806   (Morris County)
Category(s) Environmental
Sub-Category(s) Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Maintenance and repair will be necessary for equipment such as drum dumpers, vibratory hoppers, conveyors, explosive grinders, slurry mix tanks as well as pumps and motors, rotary kiln and secondary combustion burners, a baghouse, acid scrubber, wet electrostatic precipitator and an induced draft fan, a continuous emissions monitoring system (Oxygen, Carbon Monoxide and Nitrous Oxide sensors). Installation of replacement systems and merging with the existing systems may be required. Calibration support will be required for the approximate 100 flowmeters, temperature and level sensors, pressure sensors and switches and emissions monitors at the incinerator facility. This support will be necessary for the maintenance and installation of new sensors. Process support includes optimization of process operations, preparation of drawings and Process Instrumentation and Drawings (P&IDs), design support for changes and inclusion of new equipment and such support in diagnosing system and process upsets and problems, especially those unique to explosive processing. Permitting support shall include assistance in preparing reports to be submitted to the NJDEP, modifications to the RCRA and Title V Air permits, response to possible Notices of Deficiency (NODs), conducting audits of incinerator operations for compliance with regulations. This requirement will also call for off-site and on-site software, hardware and programming support for the intricate control, monitoring and recording system for the incinerator. This will require an understanding of the process algorithms inherent in such a facility control system. On-site technical support will be required for ensuring continuous operations. The contractor shall conduct Comprehensive Performance Testing (CPT) required of Hazardous Waste Combustors, and also Confirmatory Testing for dioxins and furans in accordance with the testing and sampling requirements in 40CFR63.1207. CPT and Confirmatory protocols (test plans) will be required for submission to the NJDEP prior to testing which shall allow CCDC to operate under its current Operating Parameter Limits (OPLs). A test report and Notice of Compliance (NOC) will also need to be prepared for each test. The contractor shall also provide guidance to CCDC operators on setting process and operating parameters during the performance of this testing to ensure the OPLs are maintained.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents