Similar Projects
Bldg. 592 Mezzanine Ventilation Design & Installation
Bidding
$500,000 to $1,000,000 est. value
Philadelphia, PA

Silverliner V HVAC Units
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

The Naval Foundry and Propeller Center (NFPC) 25/50 Ton Climate Changer Replacement
Post-Bid
Philadelphia, PA 19019

J--SDVOSB Set-Aside Replace Hot Coils, Valves, and Convertors at Philadelphia VA Medical Center
Results
Philadelphia, PA 191044551

Air Conditioner 10,000 Btu 120 V R410a
Results
Less than $25,000 est. value
Philadelphia, PA

Maintenance and Repair of Automatic Temperature Controls
Term Contract
Bidding
Philadelphia, PA

City Hall HVAC System Preventative Maintenance Services
Post-Bid
Philadelphia, PA 19107

Cooling System Renovation at Port Administration Building
Results
Philadelphia, PA

NAVFAC Building 2B HVAC Replacement
Bidding
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19111

Acquity Uplc H-Class System Air Management Services
Post-Bid
Philadelphia, PA

HVAC Controls Replacement PHL ATCT
Results
$50,000 to $100,000 est. value
Philadelphia, PA

Z2da--Site Preparation For Electrospinner
Bidding
$25,000 est. value
Philadelphia, PA

Ceiling Ventilator and Accessories
Post-Bid
Philadelphia, PA 19103

General HVAC Services (Maintenance and Repair)
Results
Philadelphia, PA 19102

Last Updated 09/03/2020 02:14 PM
Project Title

Grease Trap, Hood and Vent Cleaning for 4th Floor Kitchen

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Requirements contract covering the period of 9/1/20 thru 6/30/21. Grease Trap, hood and vent cleaning for 4th Floor Kitchen. Clean and maintain exhaust hoods & vents in scullery, over all stoves, ovens and grills throughout kitchen including external roof caps and equipment at scheduled intervals as per equipment specifications and provide replacements parts if needed. There is one large hood covering 4 convection ovens, 2 salamander broilers a 6 burner range and a charbroil grill top; there is one smaller hood over a 4 burner stove top. Grease trap is located in the Scullery. PG bio drain - 5 gallon bucket. Grease trap maintenance to include above referenced product along with regular service. Service to be provided quarterly at a minimum up to 4 total for the year. Quote per visit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents