Similar Projects
Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority
Infrastructure
Conception
$895,148 est. value
Fort Wayne, IN 46825

Murphy #6931 / Ft. Wayne
Demolition, New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Fort Wayne, IN 46802

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$3,281,000 CJ est. value
Washington, IN 47501

Road Reconstruction
Infrastructure
Bidding
$9,500,000 CJ est. value
Washington, IN 47501

Road Reconstruction
Infrastructure
Bidding
$9,500,000 CJ est. value
Washington, IN 47501

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

2021 HMA Resur­face Package 1
Infrastructure
Results
Fort Wayne, IN

Community Cross­ings HMA Resurface 2021
Infrastructure
Results
Fort Wayne, IN

Main Street (FKA Woerner Avenue) Floodwall Gate Replacement
Demolition, New Construction, Infrastructure
Construction
$4,497,000 CJ est. value
Clarksville, IN 47129

Main Street (FKA Woerner Avenue) Floodwall Gate Replacement
Demolition, New Construction, Infrastructure
Construction
$4,497,000 CJ est. value
Clarksville, IN 47129

North Wastewater Treatment Plant - River Ridge Development Authority
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Charlestown, IN 47111

DuPont Road Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Fort Wayne, IN 46802

Intersection Improvement, Median U-Turn
Infrastructure
Design
$1,735,199 CJ est. value
Columbus, IN 47201

Last Updated 02/09/2023 11:25 AM
Project Title

Elliott Solar Project

Physical Address View project details and contacts
City, State (County) Princeton, IN 47670   (Gibson County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Paving/Reconstruction, Power Plant, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Design Development, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $170,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 200-megawatt solar farm on 1,600 acres. Information regarding the selected EPC contractor has not been released. To be considered for vendor opportunities, please email procurement@arevonenergy.com with details about your business, your contact information and the project or location for which you are interested in providing services. This information will be shared with the EPC contractor. A firm timeline for construction has not been established, however, construction is not expected to commence prior to 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents