Similar Projects
Eagle Creek Dam Improvements Division A
Results
$1,100,000 to $1,500,000 est. value
Indianapolis, IN 46204

Indiana Harbor Confined Disposal Facility Dike Raise
Results
$10,000,000 to $25,000,000 est. value
Whiting, IN 46394

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

BL000A Crescent Steam Tunnel Repairs
Results
Bloomington, IN

West Lafayette Campus Multiple Tunnels Infrastructure Repair 2020
Results
West Lafayette, IN 47907

Reported 02/18/2021 12:00 AM
Project Title

Dam Removal on Sugar Creek

Physical Address View project details and contacts
City, State (County) Crawfordsville, IN   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Purposes:The purposes of the Lake and River Enhancement program-funded construction project include:1. Complete a dam removal project on Sugar Creek in the City of Crawfordsville. 2. Insure project success through necessary communication with the City of Crawfordsville, LARE program staff and Ecosystems Connections Inst. (ECI)II. Project Tasks: 1. Remove the 200ft long, 4-6ft tall and 2ft wide dam in accordance with permit conditions. All material from the dam will be removed and loaded directly on trucks provided by the City of Crawfordsville, who will also be responsible for hauling all debris to a final destination. 2. Dam will be accessed by way of one of the two identified routes on river right bank (northwest side) of Sugar Creek. 3. Seed, blanket/mulch any disturbed areas at the removal site, access to dam and staging area. Disturbed bank will be graded to a 3:1 or flatter slope. 4. As-built reports and removal assessments will be completed by Ecosystems Connections Institute. Selected contractor will be required to supply any information related to the dam removal project needed for the completion of the report. 5. Bid as Alternate #1 removal of metal retaining wall at west edge of dam and grading to 3:1 slope to existing creek bank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents