Similar Projects
Wooden Walkways & Beach Dune Crossovers
Renovation, Alteration
Bidding
Fire Island, NY

Pedestrian Safety Improvement Project
Infrastructure
Bidding
Suffern, NY

Reconstruction of the Rye Town Park Beach Ramps
Post-Bid
Rye, NY 10580

Central 5 Parking Lot ADA Asphalt
Post-Bid
Harrison, NY 10577

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Liberty Street Streetscape and Sidewalk Improvements
Results
Newburgh, NY 12550

ADA Entry and Ramp
Infrastructure
Pending Verification
Port Jefferson, NY 11777

Installation of New Heated Sidewalk/Stairs at Courthouse Complex
Infrastructure
Bidding
Lowville, NY 13367

2021 ADA Replacement
Post-Bid
Binghamton, NY

Plotter Kill Preserve Improvement
Results
Schenectady, NY 12305

Quackenbush Square Site Improvements
Infrastructure
Bidding
Albany, NY

Babbitt Road Sidewalk Improvements
Post-Bid
Bedford Hills, NY 10507

Beekman Avenue Pedestrian Improvements - PIN Nos. 8761.15 and 8761.50
Results
Sleepy Hollow, NY 10591

Tillson Avenue: Route 44/55(Vineyard Avenue) to Route 9w
Infrastructure
Bidding
Highland, NY 12528

Safe Route to Schools Safety Project
Post-Bid
Seneca Falls, NY 13148

Last Updated 02/21/2022 09:45 AM
Project Title

Northport Platform Replacement

Physical Address View project details and contacts
City, State (County) East Northport, NY 11731   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction services for its Northport Platform Replacement project. The primary object of the Northport Station Passenger Platform Replacement project is to bring the existing platform to a state of good repair by replacing the platform slabs, platform railings, shelter sheds, replace lighting and upgrade to LED, repairs to the platform substructure, addition of an ADA ramp, ensure ADA-compliant accessibility to the platform and provide C&D passengers with an improved station environment

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents