Similar Projects
Eagle Island, Cell 2, Erosion Protection
Bidding
$1,000,000 to $5,000,000 est. value
NC

Trenchless Installation of Welded Steel Pipe (Bore and Jack)
Bidding
NC

UNCH Labor and Delivery Headwall Replacement Project
Post-Bid
Less than $2,000,000 est. value
Chapel Hill, NC 27514

Rockingham Youth Development Center Grading and Utilities
Post-Bid
Reidsville, NC 27320

Emergency Watershed Protection Program - Recovery
Results
New Bern, NC

Cross Creek Hurricane Repair and Bank Stabilization
Results
Fayetteville, NC 28301

Apex Warehouse - Drainage Rehabilitation
Infrastructure
Bidding
Apex, NC 27502

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Erosion and Sediment Control and Rough Grading for a new Ashe County Middle School
Results
NC

Aluminum Pipe Arch With Welded Aluminum Headwalls
Infrastructure
Bidding
Clinton, Raleigh, NC 28328

18" N-12 HDPE IB/WT Double Wall 20"
Post-Bid
Jacksonville, NC

Bladen Bluffs Regional Surface Water Treatment
Results
Leland, NC 28451

Reinforced Concrete Pipe
Infrastructure
Bidding
Lillington, NC 27546

WWTP Erosion Discharge Repair
Post-Bid
Clinton, NC

Stormwater Drainage Assistance Program - Spring Drive Drainage Improvements
Results
Raleigh, NC

Reported 08/13/2021 12:00 AM
Project Title

Culvert Replacement on Valley Forge Road

Physical Address View project details and contacts
City, State (County) Hillsborough, NC 27278   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes: Temporary creek diversion, existing 96” CSP culvert removal, new 90” CSP culvert installation, concrete headwall construction, culvert backfill, water and sewer relocation, and new asphalt road installation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents