Similar Projects
Bastanchury Road Improvements from Casa Loma Avenue to Eureka Avenue (Interconnect from valley view avenue to lakeview Avenue)
Infrastructure
Bidding
$7,000,000 CJ est. value
Yorba Linda, CA 92886

Residential Slurry Seal
Infrastructure
Bidding
$1,200,000 CJ est. value
Mission Viejo, CA 92692

Tract 37509 Heirloom Street Improvements Temecula Center Dr Date Street and Ynez Road
Alteration
Post-Bid
Irvine, CA

Annual Concrete Replacement at Various Locations
Alteration
Post-Bid
$640,000 est. value
Orange, CA 92866

Omnibus Concrete Repairs
Alteration
Results
$450,000 est. value
Santa Ana, CA 92799

On-Call Asphalt Maintenance
Term Contract, Alteration
Results
Irvine, CA

Portland Ready Mix Concrete
Infrastructure
Bidding
$300,000 CJ est. value
Tustin, CA 92780

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

On-Call Aspalt Seal Coat Maintenance
Alteration
Results
Irvine, CA

On-Call Concrete Sidewalk Surface Grinding
Term Contract
Post-Bid
Irvine, CA

Central Library Fountain Restoration Project
Renovation, Infrastructure
Results
Huntington Beach, CA 92648

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

LH on the Hill Letter Display
Alteration
Results
Laguna Hills, CA

Annual Local Paving Program
Term Contract
Post-Bid
Seal Beach, CA

Concrete Crack and Spall Repair at ACC Car Park 2
Alteration
Results
Anaheim, CA

Last Updated 09/08/2022 07:32 PM
Project Title

Airfield Repairs

Physical Address View project details and contacts
City, State (County) Los Alamitos, CA 90720   (Orange County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, equipment, materials, permits and fees necessary for the Airfield Repairs located at the Joint Forces Training Base, Los Alamitos California. Work to include: completing pavement surface repairs including joint & crack sealing by filling with approved blast and jet fuel resistant crack sealant on Taxiways Charlie (T06A1) and Delta (T09A). Application of a 4 inch geotextile A/C pavement overlay to the transition of Taxiway C to Taxiway B (T06A2) and applying a sealcoating to C (T06A2) and restriping of select airfield surfaces. All work shall be in accordance with the terms, conditions, and requirements of this Invitation for Bid (IFB). The prime contractor MUST possess an A General Engineering Contractor's license. All questions regarding this IFB MUST be submitted to COR, MSG David Soto, at David.Soto@cmd.ca.gov or the ACOR, Major An Vu, at Tuongan.vu@cmd.ca.gov no later than 4:00 P.M. on September 1st, 2022. If an addendum is necessary it will be issued prior to the Bid Opening. Prevailing Wage Requirement: Yes A BID BOND, in the amount of at least 10% of the bid amount must be submitted by the contractor with the Proposal Form if the contract exceeds $25,000.00 utilizing a bond form provided by the Surety. A PERFORMANCE BOND, in the amount of 100% of the contract amount must be submitted by the successful bidder at the time signed contracts are returned to the Military Department if the contract exceeds $25,000.00. A PAYMENT BOND, Standard Form 807, in the amount of 100% of the contract amount must be submitted by the successful bidder at the time signed contracts are returned to the Military Department if the contract exceeds $25,000.00. Contractor will be allowed 120 Calendar Days to complete this project. The Start date will be established by a Job Start Meeting in which the Contractor and the COR shall conduct within 7 days after receipt of the fully executed contract and issuance of the Notice to Proceed. The Notice to Proceed will not be issued until the Contractor has completed the submittal process. The start date of the project established by the job start meeting must be within 10 days of the job start meeting.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents