Similar Projects
Secondary Non-Potable Water Storage Facility - City Of Brentwood
Alteration
Conception
$3,500,000 est. value
Brentwood, CA 94513

Synthetic Natural Gas (SNG) Back-Up System
Infrastructure
Bidding
$2,000,000 est. value
Vacaville, CA 95687

Arrow Maintenance Facility (AMF) Hydrogen Fuel Upgrade Project: Hydrogen Fuel System (HFS)
Infrastructure
Bidding
$4,000,000 est. value
San Bernardino, CA 92410

Above Ground Fuel Storage Tank
Infrastructure
Post-Bid
San Jose, CA

J045--Fuel Filtering/Underground Tanks / Generators
Term Contract
Post-Bid
Loma Linda, CA 92357

Propane Repairs at Death Valley National Park
Term Contract
Results
Death Valley, CA

Above Ground Fuel Storage Tank and Dispensing Systems
Alteration
Results
Auburn, CA

Bollman Water Treatment Plant Chemical Storage Improvements, Phase 2 and Seismic Strengthening - District Furnished Materials
Infrastructure
Bidding
Concord, CA 94520

Fuel Tank Filtering and Cleaning
Term Contract
Post-Bid
Los Angeles, CA 91343

Fuels Tank Inspection EDW
Term Contract
Results
Edwards, CA

Fuel Tank Footlings
Infrastructure
Bidding
$58,000 est. value
Lathrop, CA 95330

Fuel Filtering, Tank Cleaning and Lab Testing
Term Contract
Post-Bid
Long Beach, CA 90822

Diesel Underground Storage Tank Removal
Demolition
Results
Oceanside, CA

Water Reclamation Plant Sodium Hypochlorite Tank Replacement Project
Infrastructure
Bidding
$220,860 est. value
San Clemente, CA 92672

Maintenance of Natural Gas Pipeline
Alteration
Post-Bid
Herlong, CA 96113

Last Updated 07/14/2022 11:57 PM
Project Title

Regional Wastewater Control Facility (RWCF) Digester Gas Pipeline Expansion Joints Replacement

Physical Address View project details and contacts
City, State (County) Stockton, CA   (San Joaquin County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $160,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: All labor, tools, equipment, materials, and incidentals needed to replace the existing rubber expansion joints and bolts for the digester gas pipeline at the Regional Wastewater Control Facility (RWCF). The work shall be performed in accordance with the intent of the Contract Documents, including as stated in the Contract and the Technical and Special Provisions, excluding only the work indicated or specified to be provided by the City or others under separate contract or other arrangement. In the event of a conflict between the Project Specifications and the City of Stockton Standard Specifications and Plans, the Project Specifications shall take precedence.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents