Similar Projects
Stephenson-Taylor Water Line Extension
Term Contract
Design
$100,000 to $250,000 est. value
Carnegie, OK 73015

Hydrant Guard Post
Infrastructure
Bidding
Elgin, OK

Porter Avenue Waterline Replacement Phase II
Infrastructure
Bidding
Norman, OK

Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Oklahoma City, OK 73145

Water Line Replacement
Results
McAlester, OK 74501

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

Waterline Replacement
Infrastructure
Bidding
Tulsa, OK

AMI Electric and Water Meter Installation
Infrastructure
Post-Bid
Edmond, OK

4800-5300 Blocks Venture Road Waterline Improvement
Results
$144,490 est. value
Enid, OK

CDBG Water Line Replacement
Infrastructure
Bidding
Sand Springs, OK 74063

Waterline Fittings and Valves
Infrastructure
Post-Bid
Lawton, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

Storm Pipe Replacement, Waterline Relocation, and Roadway Reconstruction
Infrastructure
Bidding
Enid, OK

New Splash Pad at the Atoka Sports Complex
New Construction, Infrastructure
Post-Bid
Less than $250,000 est. value
Atoka, OK 74525

Last Updated 01/20/2022 08:04 AM
Project Title

Water Line Improvement

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74604   (Kay County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all tools, materials and labor and performing the work necessary to construct approximately 876 linear feet of 10 inch AWWA C900, DR18 water line on Hartford Avenue from Fifth Street to Seventh Street. Work will include fittings, valves, connections and all appurtenances required for a complete installation and abandonment of the existing deteriorated 10 inch water main. The work will also include the removal and replacement of approximately 1194 square yards of 7 inch Concrete pavement.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents