Similar Projects
North Smithfield Auto Body
New Construction, Demolition - 14,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
North Smithfield, RI 02896

Copart
Addition
Design
Exeter, RI 02822

Chafee Building Rehabiliation
Renovation
Post-Bid
Providence, RI 02907

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Simulator Upgrade Facility
New Construction, Renovation
Results
$500,000 to $1,000,000 est. value
North Kingstown, RI 02852

Z--Tomich Hall Senior Enlisted Academy
Results
$1,000,000 to $5,000,000 est. value
Newport, RI 02841

Automobile Repair Shop
Renovation - 83,567 SF
Construction
$12,000 est. value
Cranston, RI 02920

Park Avenue Auto Services
Renovation - 21,014 SF
Design
Cranston, RI 02910

Renovations to Room 482B, Building 1320
Renovation
Results
$25,000 to $100,000 est. value
Newport, RI

NUWC Building 1258 Rapid Innovation Center
Renovation
Results
Newport, RI 02841

Cranston Street Armory Reuse
Results
Providence, RI 02909

Warwick National Guard Armory - Upgrades and Modernization
Renovation
Results
Warwick, RI 02886

Construction - HVAC Renovation Project - NUWCDIVNPT
New Construction, Renovation - 3,400 SF
Results
$500,000 to $1,000,000 est. value
Newport, RI 02841

Last Updated 12/16/2020 09:56 AM
Project Title

ADAL Vehicle Maintenance Facility Building 3

Physical Address View project details and contacts
City, State (County) North Kingstown, RI 02852   (Washington County)
Category(s) Commercial, Government/Public
Sub-Category(s) Military Facility, Vehicle Sales/Service
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,094,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work is located at the Quonset Air National Guard Base, Quonset State Airport, in North Kingstown, RI. The work includes furnishing all plant, the addition to and renovation of a Vehicle Maintenance Facility equipment, labor, devices, tools, materials, transportation, services, supervision and all miscellaneous requirements to perform all operations in conjunction with the efforts to accomplish the work. Work includes: Site work is included. All work shall be complete and function as intended, as if identified exclusively. All work shall be accomplished in accordance with applicable drawings, specifications, industry standards, applicable Building and Environmental Codes, Regulations, and Laws. Project elements include, but are not limited to: sitework, utilities, interior finishes, HVAC systems, plumbing, restrooms, power, lighting, building envelope, roofing and telecommunications. Contractor shall comply with all applicable Unified Facilities Criteria (UFC) and National Guard criteria and regulations in addition to Federal, State, and local regulations.

Details

1 Vehicle Sales/Service, to 9,805 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents