Similar Projects
Behavior Health Center Landscaping
Alteration
Bidding
Saint Cloud, MN 56303

Automatic Irrigation Improvement
Infrastructure
Bidding
Medina, MN 55340

Street Tree Pruning
Post-Bid
Burnsville, MN 55337

Mowing and Landscape Maintenance
Term Contract
Post-Bid
Monticello, MN 55362

2021 Zimmerman Middle High School Synthetic Turf Field
Results
Zimmerman, MN 55398

Grading and/or Mowing 2021
Results
La Crescent, MN

Lac Qui Parle WMA Watson Sag Tree Removal
Term Contract
Bidding
Watson, MN

DNR R4 Big Stone Woody Vegetation Removal
Post-Bid
Ortonville, MN

Jackson Judicial Ditch No. 14
New Construction
Results
$675,000 est. value
Heron Lake, MN

Vault Tree Replacements
Post-Bid
Duluth, MN 55807

WWTF Irrigation System Improvements
Results
Paynesville, MN

Maintenance Services For Hanging Flower Baskets
Term Contract
Post-Bid
Saint Paul, MN

Tree Planting and Release on the Chippewa National Forest
Results
Blackduck, Walker, MN 56484

2021 Hermann Heights Landscaping Project
Post-Bid
New Ulm, MN

Old Highway 8 Intersection Improvements
Results
$2,000,000 est. value
New Brighton, MN 55112

Last Updated 10/06/2021 04:19 PM
Project Title

AS/SVE System Installation

Physical Address View project details and contacts
City, State (County) Backus, MN 56435   (Cass County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $310,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Furnish and install air sparging (AS) equipment and approximately 2,400 feet of 1-inch conveyance lines in an insulated trench with 3-inches of uniform sand bedding. 2.) Furnish and install soil vapor extraction (SVE) equipment and approximately 2,500 feet of 2-inch conveyance liens in an insulated trench with 3-inches of uniform sand bedding. 3.) Stockpile, load, and haul an estimated 25 tons of impacted soil to an approved landfill. 4.) Provide and place equipment housing shed, with electrical utility connection. 5.) Connect system appurtenances to existing AS/SVE wells. 6.) Provide system manuals and startup assistance.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents