Similar Projects
Last Updated | 06/04/2020 02:07 PM |
Project Title | 2020 Water Main Replacement Program |
Physical Address | View project details and contacts |
City, State (County) | Saint Clair Shores, MI 48081 (Macomb County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Division 1: California Street, from Harper to Greater Mack This division of the project consists of the replacement of approximately 2,351 lineal feet of eight inch (8”) water main. New water main consists of new PVC pipe installed using pipe bursting methods, new ductile iron water main installed via open cut, new hydrants, and gate valves. Other work items include CCTV of sanitary leads, lead service line replacements, pavement and sidewalk removal and replacement, new ADA ramps, landings and detectable tiles, driveway removal and replacement and minor drainage improvements. Division 2: California Street, from Greater Mack to Marter This division of the project consists of the replacement of approximately 3,301 lineal feet of eight inch (8”) water main. Approximately 2,279 lineal feet of new C900 PVC water main will be installed using pipe bursting methods, approximately 1,058 lineal feet of new C900 PVC water main installed by horizontal directly drilling (HDD), with new hydrants, and gate valves. Other work items include CCTV of storm and sanitary leads, lead service line replacements, pavement and sidewalk removal and replacement, new ADA ramps, landings and detectable tiles, driveway removal and replacement and minor drainage improvements. The Owner will consider replacing approximately 1015 feet of HDD with open cut between Malvern to Marter Streets from station ±54+85 to 65+00. Division 3: Rosedale Street from Harper to Greater Mack This division of the project consists of the replacement of approximately 2,246 lineal feet of eight (8”) inch water main. New water main consists of new PVC pipe using pipe bursting methods, new ductile iron water main installed via open cut, new hydrants and gate valves. Other work items include CCTV of sanitary leads, lead service line replacements, pavement and sidewalk removal and replacement, new ADA ramps, landings and detectable tiles, driveway removal and replacement and minor drainage improvements. Division 4: Elmira from Greater Mack to Jefferson This division of the project consists of the replacement of approximately 1,555 lineal feet of eight (8”) inch water main. New water main consists of new PVC pipe using pipe bursting methods, new hydrants and gate valves. Other work items include CCTV of sanitary leads, lead service line replacements, pavement and sidewalk removal and replacement, driveway removal and replacement and minor drainage improvements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |